Skip to main content

Lighting upgrade completed on UK motorway

UK civil and electrical engineering firm, McCann, has completed the lighting upgrades on a 19km stretch of the M62 motorway between J22-25, replacing 1,224 existing high pressure sodium lanterns with new Ampera Maxi LED lighting units. The project, coordinated by Highways England’s term contractor A-one+, also included the installation of a new central management system, with remote manipulation of operational burn hours, control over the timing of dimmed lighting when there is minimal traffic and fault mon
May 18, 2017 Read time: 1 min
UK civil and electrical engineering firm, McCann, has completed the lighting upgrades on a 19km stretch of the M62 motorway between J22-25, replacing 1,224 existing high pressure sodium lanterns with new Ampera Maxi LED lighting units.


The project, coordinated by 8101 Highways England’s term contractor A-one+, also included the installation of a new central management system, with remote manipulation of operational burn hours, control over the timing of dimmed lighting when there is minimal traffic and fault monitoring and energy consumption tracking systems. The reporting and control mechanisms can also be operated on a light-by-light basis or across the entire network.

According to McCann, the newly-installed LED lights require no routine maintenance, cutting down on man-hours required in order to keep them operational, while generating a 53 per cent energy saving and reducing annual energy consumption from 2,203,807 kWhrs to 1,041,658 kWhrs.

UTC

Related Content

  • September 13, 2016
    UK city to upgrade traffic signals
    Dynniq has been awarded a five year contract to deliver the Traffic Signals Asset Renewal (TSAR) programme to upgrade existing traffic signals equipment across the UK City of York, which is looking to reduce its annual maintenance costs. Over five years, the programme will see Dynniq replace around sixty traffic signal junctions and crossings with completely new equipment to a newly developed standard York specification. These installations will utilise the latest traffic controllers from the Dynniq PTC
  • February 2, 2016
    Smarter motorway for West Yorkshire
    Drivers on the M1 near Wakefield will benefit from reduced congestion and improved journey times after the final phase of a new US$172 million smart motorway went live. The Highways England scheme along a seven-mile stretch of motorway between junction 39 and junction 42 is the first all lane running motorway in the north, where the hard shoulder has been permanently converted to an extra lane. The smart motorway uses the latest technology to monitor traffic levels and variable speed limits on overhea
  • January 31, 2012
    Lights out on sections of UK motorway network
    Motorway lighting along a section of the M6 in Lancashire in the UK will be switched off between midnight and 5am in a move to reduce energy costs, carbon emissions, and light pollution, the Highways Agency has announced.
  • January 10, 2014
    The sunshine subsidy for Colorado’s tollways
    David Crawford reports on energy cost cutting on US highways. Just over a year after switch-on and with two global awards under its belt, the longest solar-powered toll road in the US is generating heightened interest in highway applications of alternative energy. The E-407, which loops around the eastern perimeter of the Denver metropolitan area in Colorado, won the International Bridge, Tunnel and Turnpike Association (IBTTA) President’s Overall Award for Excellence at its September 2013 Annual Meeting in