Skip to main content

Kapsch TrafficCom to upgrade Massachusetts ITMS

Kapsch TrafficCom North America has secured a four year, US$11.5 million (€10.4 million) contract to upgrade and modernise the integrated transportation management system (ITMS) at the Highway Operations Center (HOC) of the Massachusetts Department of Transportation (MassDOT). The new system will manage all of the Department’s state-wide roadway network and the Boston Metropolitan Highway System tunnel complex and facilities. The next generation ITMS, based on Kapsch’s DYNAC software suite, will efficien
June 28, 2016 Read time: 2 mins
4984 Kapsch TrafficCom North America has secured a four year, US$11.5 million (€10.4 million) contract to upgrade and modernise the integrated transportation management system (ITMS) at the Highway Operations Center (HOC) of the 7213 Massachusetts Department of Transportation (MassDOT). The new system will manage all of the Department’s state-wide roadway network and the Boston Metropolitan Highway System tunnel complex and facilities.

The next generation ITMS, based on Kapsch’s DYNAC software suite, will efficiently manage all aspects of the HOC operations by converging nearly 50 independent traffic and facility management data systems into a single platform. HOC operators will manage open highways, tunnel traffic, and critical life safety systems including fire detection, ventilation, emergency exits, and passenger information dissemination from a fully integrated user environment.

According to Kapsch, the new system will improve operational efficiency and information accuracy, facilitate consistent workflows, enhance environmental monitoring and reporting capabilities and provide state-wide and regional total situational awareness. DYNAC enables rapid, consistent, and appropriate response to traffic incidents and tunnel life safety events by generating and executing real-time response plans to help HOC operators expertly manage time sensitive, critical situations.

MassDOT operates over 4,800 kilometres of roadways, 5,000 bridges and the Metropolitan Highway System. The project will upgrade software and peripheral hardware to improve operational efficiency, enable the use of the latest advances in traffic management technology and allow for the retirement of legacy software and hardware. This new system will also replace and/or integrate with existing systems to support a number of traffic incident management functions performed on state-wide roadways and facilities from a single operating platform.

For more information on companies in this article

Related Content

  • Idaho developing wildlife-detection system to improve driver safety
    February 15, 2016
    Idaho Transportation Department’s (ITD) research program has initiated a project to evaluate an innovative new wildlife-detection system that may bring improved safety to area highways and reduce personal injury and property damage. The project is the result of a request from ITD’s northern Idaho office, and is a partnership between ITD and the Western Transportation Institute (WTI) of Montana State University. Collisions between wildlife and vehicles can be a big problem, and common in rural states such
  • Reconnecting communities with infrastructure improvements
    January 7, 2025
    Hundreds of projects to reconnect US communities separated by roadways will launch in 2025. Mary Scott Nabers takes a look at a few of them and outlines what’s involved
  • The inside story of how traffic chaos was avoided after I-95 collapse
    August 23, 2023
    June’s collapse of major US roadway I-95 in Pennsylvania could have caused lengthy traffic chaos. But - relatively speaking at least - it didn’t and gridlock was avoided. Alan Dron finds out why
  • Flir expands Marseille’s tunnel vision
    November 12, 2014
    Marseille’s city authority has added the monitoring of a second tunnel to the existing network with a new approach towards video management. Measuring 1.5km in length, the double-deck Prado Sud tunnel extends Marseille’s existing 2.5km Prado Carénage tunnel towards the southern part of the city. While it was logical to use a common control room and to use the latest detection and monitoring systems in the new tunnel, it was deemed too disruptive and costly to completely upgrade the existing tunnel.