Skip to main content

Jakarta plans integrated tunnels for traffic and floodwater

Jakarta’s city administration is to begin work on building two dual-purpose tunnels by the end of the year in an effort to address increasingly dire conditions on the capital’s gridlocked, flood-prone streets.
April 28, 2014 Read time: 1 min
Jakarta’s city administration is to begin work on building two dual-purpose tunnels by the end of the year in an effort to address increasingly dire conditions on the capital’s gridlocked, flood-prone streets.

Private building contractor Antaredja Mulia Jaya has been awarded a contract for the Jakarta Integrated Tunnel (JIT) project, which will incorporate two tunnels is set to measured 11 metres in diameter and 12 kilometres in length, from five to 15 metres below ground.  The tunnels have been designed to carry flood water and traffic on separate levels, at a projected cost of US$2.92 billion.

“The JIT development will be in collaboration with French investor Bouygues,” Antaredja head Agus Sidharta said on Friday at City Hall. Agus said his company would work with Jakarta’s toll road developer to build and maintain the road portion of the project.

Related Content

  • Australia’s Transurban to trial road user charging
    March 27, 2015
    Speaking at a major industry forum, Scott Charlton, CEO of Australian toll roads operator, Transurban, said that the country’s major cities risk a decline in liveability without major investment in transport systems and an overhaul of transport funding model. Charlton said that despite significant progress by state governments traditional funding systems were outdated, unsustainable and unfair, and cannot sustain the funding needed to address Australia’s transport infrastructure deficit. Charlton said it
  • Underinvestment in infrastructure threatens economic growth
    January 24, 2012
    The 2011 Urban Mobility Report from the Texas Transportation Institute highlights the dangers of continued underinvestment in transportation infrastructure but also offers some hope in terms of possible solutions
  • The inside story of how traffic chaos was avoided after I-95 collapse
    August 23, 2023
    June’s collapse of major US roadway I-95 in Pennsylvania could have caused lengthy traffic chaos. But - relatively speaking at least - it didn’t and gridlock was avoided. Alan Dron finds out why
  • Bright shiny green future: Asecap Sustainability Forum
    August 30, 2023
    Knowing your company’s carbon footprint is one thing, but the real issue is understanding and reporting to investors Scope 3 emissions. David Arminas reports from the 2nd Asecap Sustainability Forum in Vienna, Austria