Skip to main content

Iteris wins traffic light synchronisation project along major California corridor

Iteris has been selected by the Orange County Transportation Authority (OCTA) to synchronise 68 traffic lights along Katella Avenue in Orange County, California, as part of the Proposition 1B - Traffic Light Synchronization Program (TLSP). The contract, valued at $674,000, is expected to begin immediately.
April 19, 2012 Read time: 2 mins
73 Iteris has been selected by the 1768 Orange County Transportation Authority (OCTA) to synchronise 68 traffic lights along Katella Avenue in Orange County, California, as part of the Proposition 1B - Traffic Light Synchronization Program (TLSP). The contract, valued at $674,000, is expected to begin immediately.

Katella Avenue, which spans across nine jurisdictional boundaries, is a main artery to many tourists and visitor hotspots, including the Disneyland Theme Parks, Los Alamitos Race Track, the Angels Stadium of Anaheim (Home of Major League Baseball’s Los Angeles Angels), the 1683 Honda Center (Home of the National Hockey League’s Anaheim Ducks), and the future Anaheim Regional Transportation Intermodal Center.

The project involves upgrading traffic signal electronics equipment and optimising signal timing along the entire Katella Avenue corridor to increase throughput, reduce travel times, and improve overall safety. Proposition 1B is a $19 billion transportation bond that was approved by California voters in 2006. Through Prop 1B, the TLSP was established with the objectives to improve traffic flow and safety through synchronisation of traffic signals and technology-based improvements.

"Iteris was selected for this project because they have demonstrated a thorough understanding of the Katella Avenue corridor by identifying and then providing excellent recommended solutions on the key issues," stated Ron Keith, principal traffic engineer for the Orange County Transportation Authority. "They have a large presence with excellent recommendations from the local agencies in Orange County providing optimised traffic signal timing, hardware installations, system design, and consensus building with the local agencies."

Abbas Mohaddes, Iteris' president and chief executive officer, noted, "Traffic signal synchronisation is an ideal method to reduce traffic congestion and help agencies meet federal air quality mandates."

Related Content

  • November 6, 2014
    Iteris wins $1.4 million signal system management project
    Iteris is to serve as system manager for the deployment of the City of Omaha’s Intelligent Transportation System (ITS). The US $1.4 million project builds upon Omaha’s Traffic Signal System Master Plan, developed by Iteris in 2012, and will include the management of Omaha’s $35 million ITS upgrade program to reduce congestion. As system manager, Iteris will oversee the enhancements to the transportation network, focusing on more than 1,000 traffic signals and 4,500 miles of roadway in the city. Iteris’ r
  • September 30, 2024
    Priority is on transit for Lyt and Octa in Orange County
    Advanced traffic signal prioritisation tech is designed to improve daily commutes
  • November 28, 2013
    Major setback for California's high speed train
    The future of the California high speed rail project hangs in the balance as a result of two rulings handed down by Sacramento Superior Court Judge Michael Kenny on 25 November. "The judge's ruling will prevent the [California High-Speed Rail] Authority from spending bond measure funds for construction until the funding plan is brought into compliance," said Michael Brady, co- lead attorney on the case, but because that would require finding at least US$25 billion in extra funds, Brady believes complianc
  • May 18, 2012
    Iteris wins ITS integration services contract
    Iteris has been awarded a US$1.4 million ITS integration services contract from the city of Oxnard, in California, for deployment of the city’s ITS Master Plan. Since 2006, the company has been providing ITS services to Oxnard which is the 19th most populous city in California and the most populous in Ventura County. The six-year partnership began with the development of the city’s ITS Master Plan, followed by detailed design of the citywide ITS, and now its integration and deployment.