Skip to main content

Iteris to plan and design Orange County’s ICM project

Iteris has been awarded a US$2.6 million contract to implement the Integrated Corridor Management (ICM) project in Orange County, California in an effort to improve mobility in the heavily congested Platinum Triangle. The Platinum Triangle confluence of corridors ranked as having the highest vehicle hours of delay in 2012, along with the highest concentration of special events at locations including Disneyland Resort and Theme Park, Angels Stadium, Honda Center and Anaheim Convention Center. This ini
October 27, 2016 Read time: 1 min
73 Iteris has been awarded a US$2.6 million contract to implement the Integrated Corridor Management (ICM) project in Orange County, California in an effort to improve mobility in the heavily congested Platinum Triangle.

The Platinum Triangle confluence of corridors ranked as having the highest vehicle hours of delay in 2012, along with the highest concentration of special events at locations including Disneyland Resort and Theme Park, Angels Stadium, Honda Center and Anaheim Convention Center.

This initial ICM project will integrate freeway and arterial operations along the I-5, SR-55 and SR-91 freeways to improve mobility in Orange County. The project will also leverage system components planned for the I-210 Connector Corridor in Los Angeles, to which Iteris is a contributor. It is expected the project will establish a framework for future ICM projects in Orange County and the state.

For more information on companies in this article

Related Content

  • Coachella's CV Sync uses Kinetic Mobility ATMS
    August 19, 2024
    California smart traffic management upgrade project requires scalable ITS tech
  • LA Metrolink's mobile ticketing now available system-wide
    April 1, 2016
    Los Angeles Metrolink's mobile ticketing app, which allows passengers the option to purchase tickets on a smartphone, tablet or other mobile device, is now available for all Metrolink trips, including trips connecting to Los Angeles Union Station. The system-wide launch is in time for Metrolink's Angels Express, where fans can take the train from LA Union Station or Laguna Niguel/Mission Viejo to all Angels weekday home games starting at 7:05 p.m. on Metrolink's Orange County Line. For Friday night home
  • Bogotá’s affordable path to safer roads
    April 28, 2022
    Enforcing speed limits on key corridors is a cost-effective way of reducing collisions in the Colombian capital, say the authors of a new study. Andrew Stone talks to them
  • Jeddah juggles transport needs of residents, pilgrims and tourists
    December 22, 2015
    Mass pilgrimages, new tourists and a growing population lead Jeddah to seek some smart transport solutions as David Crawford finds out. Rationalising traffic movement and public transport in a major Middle Eastern business and tourist centre that is also a gateway for millions of religious pilgrims every year is the challenge for the 20-year Jeddah Strategic Plan and the Jeddah Public Transport Programme (JPTP) it spawned. The latter is costed at US$8bn.