Skip to main content

Iteris to plan and design Orange County’s ICM project

Iteris has been awarded a US$2.6 million contract to implement the Integrated Corridor Management (ICM) project in Orange County, California in an effort to improve mobility in the heavily congested Platinum Triangle. The Platinum Triangle confluence of corridors ranked as having the highest vehicle hours of delay in 2012, along with the highest concentration of special events at locations including Disneyland Resort and Theme Park, Angels Stadium, Honda Center and Anaheim Convention Center. This ini
October 27, 2016 Read time: 1 min
73 Iteris has been awarded a US$2.6 million contract to implement the Integrated Corridor Management (ICM) project in Orange County, California in an effort to improve mobility in the heavily congested Platinum Triangle.

The Platinum Triangle confluence of corridors ranked as having the highest vehicle hours of delay in 2012, along with the highest concentration of special events at locations including Disneyland Resort and Theme Park, Angels Stadium, Honda Center and Anaheim Convention Center.

This initial ICM project will integrate freeway and arterial operations along the I-5, SR-55 and SR-91 freeways to improve mobility in Orange County. The project will also leverage system components planned for the I-210 Connector Corridor in Los Angeles, to which Iteris is a contributor. It is expected the project will establish a framework for future ICM projects in Orange County and the state.

For more information on companies in this article

Related Content

  • Senior Iteris appointment
    July 13, 2012
    Tom Blair, an experienced software industry leader, has joined Iteris and assumed the new position of senior vice president of Iteris’s recently established iPerform group. The group was established in 2011 to focus on the development and deployment of software-based performance measurement and information management solutions. It was expanded with the acquisition of Berkeley Transportation Systems in October 2011, and has since made several key management appointments.
  • Connected vehicles - potential to transform US transportation
    April 12, 2013
    There’s a new face in the driving seat at the US Department of Transport’s ITS Joint Program Office. Fortunately, as Robin Meczes finds out, he’s no learner driver… Ask Kenneth Leonard why he wanted his new job as director of the ITS Joint Program Office, and his answer comes back without a second’s delay. “The potential to save lives, reduce injuries and help people enjoy a more efficient transportation system is the kind of challenge that makes me want to come to work each morning,” he says. “In my opinio
  • Mounting benefits of dynamic tolling project
    January 30, 2012
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was
  • US ITS systems approach critical decision time
    February 6, 2012
    Connie Sorrell, chair of the ITS America Annual Meeting and Exposition, explains why ITS in America is approaching a critical crossroads