Skip to main content

Iteris to plan and design Orange County’s ICM project

Iteris has been awarded a US$2.6 million contract to implement the Integrated Corridor Management (ICM) project in Orange County, California in an effort to improve mobility in the heavily congested Platinum Triangle. The Platinum Triangle confluence of corridors ranked as having the highest vehicle hours of delay in 2012, along with the highest concentration of special events at locations including Disneyland Resort and Theme Park, Angels Stadium, Honda Center and Anaheim Convention Center. This ini
October 27, 2016 Read time: 1 min
73 Iteris has been awarded a US$2.6 million contract to implement the Integrated Corridor Management (ICM) project in Orange County, California in an effort to improve mobility in the heavily congested Platinum Triangle.

The Platinum Triangle confluence of corridors ranked as having the highest vehicle hours of delay in 2012, along with the highest concentration of special events at locations including Disneyland Resort and Theme Park, Angels Stadium, Honda Center and Anaheim Convention Center.

This initial ICM project will integrate freeway and arterial operations along the I-5, SR-55 and SR-91 freeways to improve mobility in Orange County. The project will also leverage system components planned for the I-210 Connector Corridor in Los Angeles, to which Iteris is a contributor. It is expected the project will establish a framework for future ICM projects in Orange County and the state.

UTC

Related Content

  • November 12, 2021
    Iteris wins $1.1m smart mobility deal 
    Three-year project supports OCTA’s transportation funding scheme 
  • July 13, 2016
    Iteris awarded traffic signal synchronisation project
    Orange County Transportation Authority (OCTA), California, has awarded Iteris a US$2.1 million traffic signal synchronisation and communication as part of its on-going mobility enhancements. The project also includes upgrades to traffic signal infrastructure and signal timing improvements along a heavily travelled nine-mile stretch of the Pacific Coast Highway (PCH) in Newport Beach. Iteris will design and implement traffic signal system infrastructure and fibre-optic communications equipment and synchro
  • April 23, 2013
    Iteris announces San Mateo County (Calif.) smart corridor win at ITS America
    teris won a $580,000 contract has the final integration phase of the San Mateo Smart Corridor Program, continuing a collaboration of 13 agencies and cities to design, deploy and integrate ITS solutions and strategies along the US-101 corridor in the county.
  • February 8, 2017
    Michael Baker International to study traffic congestion in Los Angeles
    Los Angeles County Metropolitan Transportation Authority (Metro) has awarded Michael Baker International a contract to study the I-605/SR-91 interchange, identify improvements and widen a particularly congested three-mile stretch of westbound SR-91 in Los Angeles. The project spans westbound SR-91 from the vicinity of Shoemaker Avenue to the I-605/SR-91 interchange, used by 270,000 vehicles a day. It also includes improvements to the Norwalk, Pioneer and Bloomfield local interchanges within the Gateway