Skip to main content

Iteris to plan and design Orange County’s ICM project

Iteris has been awarded a US$2.6 million contract to implement the Integrated Corridor Management (ICM) project in Orange County, California in an effort to improve mobility in the heavily congested Platinum Triangle. The Platinum Triangle confluence of corridors ranked as having the highest vehicle hours of delay in 2012, along with the highest concentration of special events at locations including Disneyland Resort and Theme Park, Angels Stadium, Honda Center and Anaheim Convention Center. This ini
October 27, 2016 Read time: 1 min
73 Iteris has been awarded a US$2.6 million contract to implement the Integrated Corridor Management (ICM) project in Orange County, California in an effort to improve mobility in the heavily congested Platinum Triangle.

The Platinum Triangle confluence of corridors ranked as having the highest vehicle hours of delay in 2012, along with the highest concentration of special events at locations including Disneyland Resort and Theme Park, Angels Stadium, Honda Center and Anaheim Convention Center.

This initial ICM project will integrate freeway and arterial operations along the I-5, SR-55 and SR-91 freeways to improve mobility in Orange County. The project will also leverage system components planned for the I-210 Connector Corridor in Los Angeles, to which Iteris is a contributor. It is expected the project will establish a framework for future ICM projects in Orange County and the state.

For more information on companies in this article

Related Content

  • MaaS will be adopted quicker in Europe than in the US: here’s why
    December 5, 2018
    A new report suggests that MaaS will be implemented more quickly in Europe than in the US – but why should this be? Ben Spencer examines the arguments
  • RIDOT selects tolling program Contractor
    June 8, 2017
    The Rhode Island Department of Transportation (RIDOT) has awarded Kapsch Traffic Com IVHS the contract to design and build the all-electronic tolling facilities and associated infrastructure for Rhode Island's truck-only tolling program. The company will also operate and maintain all the tolling facilities.
  • Esri maps cause and effect
    September 26, 2024
    The work of the Connecticut Transportation Safety Research Center means engineers can concentrate on developing more effective safety measures, rather than having to sort out raw crash data
  • Canadian JV to build next phase of Ontario BRT
    September 30, 2015
    Metrolinx and York Region Rapid Transit Corporation (YRRTC) today announced the award of a US$248 million contract to the EDCO joint venture to design, build and finance the next phase of the dedicated York Viva Bus Rapid Transit rapidways along the Highway 7 transit corridor Southern Ontario, Canada. This initiative is part of the York Viva BRT project which represents a US$1 billion transit investment from the Government of Ontario and is part of Metrolinx's 25-year Regional Transportation Plan for an