Skip to main content

Iteris to plan and design Orange County’s ICM project

Iteris has been awarded a US$2.6 million contract to implement the Integrated Corridor Management (ICM) project in Orange County, California in an effort to improve mobility in the heavily congested Platinum Triangle. The Platinum Triangle confluence of corridors ranked as having the highest vehicle hours of delay in 2012, along with the highest concentration of special events at locations including Disneyland Resort and Theme Park, Angels Stadium, Honda Center and Anaheim Convention Center. This ini
October 27, 2016 Read time: 1 min
73 Iteris has been awarded a US$2.6 million contract to implement the Integrated Corridor Management (ICM) project in Orange County, California in an effort to improve mobility in the heavily congested Platinum Triangle.

The Platinum Triangle confluence of corridors ranked as having the highest vehicle hours of delay in 2012, along with the highest concentration of special events at locations including Disneyland Resort and Theme Park, Angels Stadium, Honda Center and Anaheim Convention Center.

This initial ICM project will integrate freeway and arterial operations along the I-5, SR-55 and SR-91 freeways to improve mobility in Orange County. The project will also leverage system components planned for the I-210 Connector Corridor in Los Angeles, to which Iteris is a contributor. It is expected the project will establish a framework for future ICM projects in Orange County and the state.

For more information on companies in this article

Related Content

  • Priority is on transit for Lyt and Octa in Orange County
    September 30, 2024
    Advanced traffic signal prioritisation tech is designed to improve daily commutes
  • Benefits of traffic light synchronisation
    January 27, 2012
    Alicia Parkway corridor, located in Orange County, California, was part of Phase 1 of an inter-jurisdictional Traffic Light Synchronisation Programme (TLSP) in Orange County designed to increase mobility and overall drive quality while reducing fuel consumption and greenhouse gas emissions. By increasing average speeds and reducing travel times via the reduction in stops, the programme sought to reduce vehicle acceleration and deceleration events along the corridor; these have been identified as the leadin
  • LA approves $400bn 30-year transport plan
    September 30, 2020
    City hopes multi-billion, long-term investment will ease traffic delays and reduce air pollution
  • New technology and economics at ITS World Congress 2011
    January 19, 2012
    ITS America prepares for the 18th World Congress on ITS and 2011 Annual Meeting, 16-20 October 2011, Orange County Convention Center, Orlando, Florida. In the final moments of the 2008 ITS World Congress in New York City, organisers and planning committee members quietly celebrated the conclusion of another extremely successful event for the ITS industry. In spite of the economic climate at the time, the 2008 World Congress was well attended by delegates from 66 countries and yielded impressive results than