Skip to main content

Iteris awarded transit performance initiative project by San Francisco transit company

Iteris has been awarded a US$934,000 contract for design services by Alameda-Contra Costa Transit (AC Transit) for a corridor travel time improvement project. The project includes the implementation of transit signal priority (TSP), bus stop improvements, real-time passenger information system, and deployment of an adaptive signal control technology system.
May 31, 2017 Read time: 1 min
Iteris has been awarded a US$934,000 contract for design services by Alameda-Contra Costa Transit (AC Transit) for a corridor travel time improvement project. The project includes the implementation of transit signal priority (TSP), bus stop improvements, real-time passenger information system, and deployment of an adaptive signal control technology system.


This contract continues 73 Iteris’ involvement on 274 AC Transit’s popular Line 97, which spans 12.5 miles along a number of major corridors in the San Francisco Bay Area.

The design phase of the project is under way with deployment anticipated in 2018. Transit signal priority helps to reduce delay and improve schedule reliability for transit operations. Currently the service time for this route is 134 minutes. Once the project improvements are fully deployed, a roundtrip travel time is expected to be reduced by as much as 15 per cent.

UTC

Related Content

  • January 27, 2012
    Improving urban traffic control in Atlanta
    Hugh Colton, Georgia DOT details move to improve urban traffic control in the Atlanta area. With a significant proportion of traffic using freeways and toll-ways, along with a significant investment in roadway infrastructure, urban arterials are often the poor relation when it comes to ITS investment. Hitherto the primary means of Urban Traffic Control (UTC) has been the ubiquitous traffic signal. Many traffic signals still operate in a standalone mode and traffic detection is often broken, leaving the sign
  • September 20, 2012
    Developing integrated transport networks
    A major initiative in managing numerous transport networks as a single system has moved into a significant phase with design of sophisticated new ITS systems. Jon Masters reports. Detailed design work is under way on two pilot projects pursuing a common principle – that transportation can be made more efficient or effective if the various networks and modes of travel are managed as a whole system. This is the central tenet of the US Department of Transportation’s (USDOT) Integrated Corridor Management (ICM)
  • August 1, 2017
    San Francisco Bay Area transit systems extend Cubic operations contract
    Cubic Transportation Systems (CTS) has been awarded a contract extension of up to five years from the Metropolitan Transportation Commission (MTC) for operations and maintenance services supporting the regional Clipper card fare payment system in the San Francisco Bay Area. The extended contract period is from November 2019 to November 2024 and is valued at approximately US$25 million per year. MTC is the transportation planning, financing and coordinating agency for the nine-county San Francisco Bay Area.
  • November 12, 2021
    Iteris wins $1.1m smart mobility deal 
    Three-year project supports OCTA’s transportation funding scheme