Skip to main content

Iteris awarded transit performance initiative project by San Francisco transit company

Iteris has been awarded a US$934,000 contract for design services by Alameda-Contra Costa Transit (AC Transit) for a corridor travel time improvement project. The project includes the implementation of transit signal priority (TSP), bus stop improvements, real-time passenger information system, and deployment of an adaptive signal control technology system.
May 31, 2017 Read time: 1 min
Iteris has been awarded a US$934,000 contract for design services by Alameda-Contra Costa Transit (AC Transit) for a corridor travel time improvement project. The project includes the implementation of transit signal priority (TSP), bus stop improvements, real-time passenger information system, and deployment of an adaptive signal control technology system.


This contract continues 73 Iteris’ involvement on 274 AC Transit’s popular Line 97, which spans 12.5 miles along a number of major corridors in the San Francisco Bay Area.

The design phase of the project is under way with deployment anticipated in 2018. Transit signal priority helps to reduce delay and improve schedule reliability for transit operations. Currently the service time for this route is 134 minutes. Once the project improvements are fully deployed, a roundtrip travel time is expected to be reduced by as much as 15 per cent.

For more information on companies in this article

Related Content

  • Iteris gets $9.6m green light in Orange County
    April 18, 2024
    Signal timing design, operations & maintenance are on agenda in US state of California
  • San Francisco Bay Bridge east span opens
    September 5, 2013
    After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span. The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.
  • Atlanta ponders Mobility as a Service for seamless transit
    June 29, 2018
    Drivers in Atlanta spent 70 hours in peak-time traffic jams last year. As the MaaS Market conference moves to the US’s fourth most congested city, we ask how Mobility as a Service can help. Colin Sowman winds down his window to listen. It is not by accident that ITS International’s first MaaS Market conference outside London is being hosted in Atlanta. The event is being supported by Georgia State Road & Tollway Authority and the City of Atlanta – and again not without a reason as metro Atlanta is looking
  • Platooning with Ease on the I-70
    July 15, 2025
    What would happen to truck platooning - a nascent technology - if the weather turns nasty? The I-70 Truck Automation Corridor Project in the northern US should provide some answers, reports David Arminas…