Skip to main content

Iteris awarded traffic signal synchronisation project

Orange County Transportation Authority (OCTA), California, has awarded Iteris a US$2.1 million traffic signal synchronisation and communication as part of its on-going mobility enhancements. The project also includes upgrades to traffic signal infrastructure and signal timing improvements along a heavily travelled nine-mile stretch of the Pacific Coast Highway (PCH) in Newport Beach. Iteris will design and implement traffic signal system infrastructure and fibre-optic communications equipment and synchro
July 13, 2016 Read time: 1 min
1768 Orange County Transportation Authority (OCTA), California, has awarded 73 Iteris a US$2.1 million traffic signal synchronisation and communication as part of its on-going mobility enhancements. The project also includes upgrades to traffic signal infrastructure and signal timing improvements along a heavily travelled nine-mile stretch of the Pacific Coast Highway (PCH) in Newport Beach.

Iteris will design and implement traffic signal system infrastructure and fibre-optic communications equipment and synchronise all traffic lights along the PCH corridor, a major artery that is used by travellers and commuters. The primary goal of the project is to improve traffic flow efficiency and safety for all users including vehicles, buses, bicycles, and pedestrians.

According to Ramin Massoumi, senior vice president of transportation systems at Iteris, the project represents a significant step in preparing for expansion into the building of Smart Communities with new and expanded communications infrastructure, ensuring transportation information is easily collected and shared.
UTC

Related Content

  • October 28, 2020
    Iteris retimes Florida traffic signals
    Programme includes signal coordination and timing improvements at key intersections 
  • April 8, 2013
    NJDOT traffic signal coordination project begins
    The New Jersey Department of Transportation (NJDOT) has started work on a much-needed congestion relief project, using technology to improve traffic flow along a thirteen mile stretch of Route 22 in Somerset and Union counties. The US$7.77 million project will improve mobility along the entire corridor through the creation of an integrated system interconnecting eighteen traffic signals into one controlled traffic signal system (CTSS). This includes the complete replacement of the existing traffic signal sy
  • March 28, 2024
    Texas & South Dakota wins for Iteris
    Contracts involve its ClearMobility platform and ClearRoute traveller information system
  • March 31, 2016
    OCTA seeks proposals from three teams for I-405 freeway project
    The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re