Skip to main content

Introduction to traffic signals

A new book by Alastair Gollop, senior ITS consultant at Mott McDonald, Traffic Signals, offers a comprehensive guide to traffic signals from first principles and design issues to equipment and testing, commissioning and assessments. In addition, there are sections covering the history and future of signals. Although based on equipment and operating systems utilised in the UK, the principles covered are relevant to users worldwide. Aimed at anyone interested by traffic signals, Gollop says the book assume
March 10, 2016 Read time: 2 mins
A new book by Alastair Gollop, senior ITS consultant at Mott McDonald, Traffic Signals, offers a comprehensive guide to traffic signals from first principles and design issues to equipment and testing, commissioning and assessments. In addition, there are sections covering the history and future of signals. Although based on equipment and operating systems utilised in the UK, the principles covered are relevant to users worldwide.

Aimed at anyone interested by traffic signals, Gollop says the book assumes no prior knowledge, but builds to a complete introduction to the subject. It is primarily aimed at traffic signal practitioners of all levels, graduate engineers seeking an introduction to the field and members of other engineering specialism's and client groups wishing to further their understanding of the subject.

Traffic Signals looks at the way in which modern signals operate and the equipment commonly used in current traffic control systems in the UK. It also looks at how signalised junctions and crossings are designed, explaining the fundamental design principles, and how these are used by modern software modelling tools to predict traffic operation.
 
Included within the book is a set of standard detail drawings which are commonly used when specifying and designing projects.

Related Content

  • Integrating traffic management and tolling technologies
    April 25, 2013
    Jamie Surkont, head of road safety enforcement with Kapsch, outlines the company’s efforts to set up and align new traffic management business units with its more widely recognised tolling expertise The blurring of ITS applications’ edges brought about by systems’ increasing functionalities will ensure that many of the technologies which we have come to rely on for road and traffic management will find it increasingly difficult to exist or operate within tight market verticals. At the same time, systems man
  • Smoothing out city freight movements
    May 28, 2014
    David Crawford welcomes a national first. Urban freight movements, while commercially and socially vital, are a growing logistical headache for planners and people alike. Figures from France’s Lyon Laboratory of Transport Economics indicate that goods transport in major urban areas accounts for: 20% of traffic; 35% of CO2 emissions made by all urban trips; and 50% of the diesel used; while final km delivery runs account for 20% of the total cost of the transport chain.
  • Traffic management turns to machine vision
    June 1, 2016
    Traffic engineers can use the latest advances in vision technology to streamline and enhance traffic management. The idea of using one camera to perform all functions at an intersection is attractive to authorities for many reasons and camera supplier Gridsmart says it can make this happen. Its Bell Camera offers a horizon to horizon view that includes the centre of the intersection where vehicles, bicycles and pedestrians cross paths and it can be used for traffic light actuation, traffic data collection a
  • Europe's electronic toll service closer to operational reality
    November 7, 2012
    After much debate and delay, a unifying European Electronic Toll Service is now finally on the horizon, says ASFiNAG’s Klaus Schierhackl. Here, he talks with Jason Barnes about what that might mean. Aworkable European Electronic Toll Service (EETS) which will allow truck drivers to travel across the continent and pay tolls using a single account and OnBoard Unit (OBU) was originally timetabled to be in place and operating by October of this year. A lack of urgency from some of the stakeholders involved in t