Skip to main content

Intelligent lane control signals help direct driver behaviour

As part of a larger effort exploring the effects of roadway signage on driver behaviour, researchers from the University of Minnesota College of Design have conducted a study on the effectiveness of intelligent lane control signals (ILCS). During the study, was funded by the Minnesota Department of Transportation (MnDOT), the research team used a driving simulator to test ILCS that displayed merge, speed control, and lane-closure warnings over freeway lanes. The researchers were specifically interested in d
November 21, 2012 Read time: 3 mins
As part of a larger effort exploring the effects of roadway signage on driver behaviour, researchers from the University of Minnesota College of Design have conducted a study on the effectiveness of intelligent lane control signals (ILCS).

During the study, was funded by the 2103 Minnesota Department of Transportation (MnDOT), the research team used a driving simulator to test ILCS that displayed merge, speed control, and lane-closure warnings over freeway lanes. The researchers were specifically interested in determining which type of merge signs - diagonal arrows, words, or dynamic chevrons - had the most effect on drivers’ behaviour.

Study participants drove on a six-lane divided highway in a driving simulator, where they were presented with five sets of ILCS prompting them to reduce their speed and merge out of the centre lane. The researchers collected lane position and driving speed data from each participant to determine how effectively the signs conveyed their intended messages.

Overall results indicate that the ILCS are effective at directing driver behaviour. Most participants reduced their speed when they approached the speed signs, and the majority of drivers merged out of the centre lane as they approached the first ILCS displaying a lane closure warning.

“This research allowed MnDOT to determine how well motorists understand the messages used on our ILCS,” says Brian Kary, freeway operations engineer at MnDOT. “The Active Traffic Management System on I-35W is one of the first in the nation, so there had been little guidance as to the types of messages to display.”

Specifically, the researchers found that drivers responded to the diagonal arrow merge signs much earlier than to the merge signs with words or chevrons. Participants changed lanes 266 feet before reaching the arrow merge sign, compared to 123 feet before the chevron and 54 feet before the words. The simplicity of the arrow sign was probably a factor, the researchers say. The arrow was larger and simpler than the other two sign types and likely took less time for drivers to process.

The study also included a survey that asked participants for their opinions of ILCS and other changeable message signs. Most participants had positive opinions of the signs, particularly those that display information on travel time, traffic problems, and roadway maintenance schedules.

For more information on companies in this article

Related Content

  • What's next for traffic management and data collection?
    January 26, 2012
    As the technologies and stakeholders in traffic management evolve, what can we expect to see happening in the coming years? For many, the conversation of the moment is just how, and how far, the newer technologies and services provided principally by the private sector should be allowed to intrude into the realms of traffic management.
  • VRU safety report urges enforcement
    March 18, 2020
    Enforcement must be at the heart of a drive to reduce vulnerable road user deaths and injuries, says the latest report from the European Transport Safety Council. Its facts and figures give authorities the justification to invest more in camera technology and other ITS solutions
  • ITS technology reduces congestion, improves workzone safety
    July 17, 2012
    As the road-building season gets under way in the US, the Federal Highway Administration has just published a White Paper which deals with the use of ITS technology in work zones. On 30 April 2009, the US Federal Highway Administration (FHWA) published a White Paper which was prepared by the US Department of Transportation (USDOT) to inform public agencies about the use of ITS to manage construction work zones. This is a particularly relevant topic given the large number of construction projects that are ex
  • The case for integrating urban traffic control and parking
    February 3, 2012
    Although urban traffic control and parking management are inextricably linked in so many ways, there remain fundamental differences which undermine closer integration. Car parking guidance systems can have a significant, positive impact on congestion in town and city centres, however conflicting business models still stand in the way of the more profound integration of car parking management and Urban Traffic Control (UTC) systems.