Skip to main content

Indra wins in India with two transport and traffic contracts

Indra has increased its penetration of the Indian transport and traffic by winning two contracts with a total value of US$12.5 million to deploy its technology in the longest tunnel in Southeast Asia, between Chenani and Nashri, and in the Navi Mumbai metro system, in India's financial capital, both currently under construction. Under the first contract, Indra is responsible for the design, supply, set-up and rollout of the control system for the 9.2 km long tunnel and will equip the control center with
November 30, 2015 Read time: 3 mins
509 Indra has increased its penetration of the Indian transport and traffic by winning two contracts with a total value of US$12.5 million to deploy its technology in the longest tunnel in Southeast Asia, between Chenani and Nashri, and in the Navi Mumbai metro system, in India's financial capital, both currently under construction.

Under the first contract, Indra is responsible for the design, supply, set-up and rollout of the control system for the 9.2 km long tunnel and will equip the control center with its proprietary Horus solution. This will enable the centralised integrated management of the various intelligent traffic systems (ITS) that will be deployed in the tunnel and ensure compliance with quality and security standards.

The project includes implementation of the automatic incident detection, video surveillance, traffic control, signalling, fire detection, access control and emergency call systems. It will also integrate other sub-systems supplied by local companies, such as lighting, ventilation, communication and energy systems.

Indra's technology will enable the tunnel to be monitored  all times and provide real-time information for decision-making purposes. The high level of automation of operations will facilitate speedy and accurate management of everything that happens in the tunnel, both for routine management purposes and in emergency situations. Indra's solution will also make it possible to offer real-time information to drivers and deliver optimal safety and service quality, helping to reduce the risk of incidents and optimise the use of resources in those situations.

For the second contract, Indra will implement a latest-generation contactless ticketing system to enhance the service and information provided to the more than 18 million residents of Mumbai, simultaneously facilitating the control, financial management and tracking of resources. The company will design, manufacture, engineer, supply and implement the access control and ticketing systems for the new metro line currently under construction in the southeast sector of the city of Mumbai,

Passengers will be able to top up their contactless cards or buy the electronic tokens at any of the 11 stations along the line, either using the automatic dispensing machines or at the customer service/ticket offices at each station. The access control systems will allow users to validate their cards by simply passing them over the scanner, leading to faster and more convenient access.

The solution supplied by Indra will also include portable top-up and inspection devices to allow these processes to be carried out directly on trains and platforms.

UTC

Related Content

  • January 23, 2015
    Alstom wins new Kochi metro line contracts
    Alstom has been awarded two contracts worth over US$73 million by Delhi Metro Rail Corporation (DMRC) to supply signalling, telecom and electrification solutions for the new Kochi metro line. The projects will be implemented in early 2016 and commercial service is scheduled to begin in March 2016. The contracts include 25 Alstom Metropolis trains which will circulate on the new Kochi metro line which is 25 kilometres long and includes 22 stations. These trains will carry up to 15,000 passengers per hour
  • April 23, 2024
    Minneapolis-St. Paul’s Go-To gets the Cubic touch
    Contactless fare system is centrepiece of upgrade to transit ticketing in the Twin Cities
  • June 22, 2012
    Hong Kong ticketing
    Hong Kong MTR has awarded Thales a contract to supply an Automatic Fare Collection (AFC) and security access management system for West Island Line (WIL), South Island Line (SIL(E)) and Kwun Tong Line Extension (KTE), which are all new extensions, currently under construction, of the existing MTR rail network. The WIL, consisting of three stations, will add another 3km to the Island Line; SIL(E), with five stations, is a new 7km section; while KTE is a 2.6 km extension of the current Kwun Tong Line with two
  • May 14, 2025
    Sharjah tunnel contract for Kapsch
    Five-year, five-tunnel United Arab Emirates deal also involves maintenance