Skip to main content

Indra tunnel solution used on four tunnels for Bogotá-Villavicencio divided highway project

Indra, Coviandes's principal technology partner on the Bogotá-Villavicencio divided highway project, has implemented its traffic and tunnel solution on four tunnels located between Cáqueza and Puente Quetame, in Columbia. It is designed with the intention of facilitating operation, automating processes, reducing the risk of incidents, streamlining management and providing safety for drivers. Called Horus, the solution will be installed on the Herradura, Moscosio, Culebra and Oro Perdido tunnels. It
November 27, 2017 Read time: 1 min

509 Indra, Coviandes's principal technology partner on the Bogotá-Villavicencio divided highway project, has implemented its traffic and tunnel solution on four tunnels located between Cáqueza and Puente Quetame, in Columbia. It is designed with the intention of facilitating operation, automating processes, reducing the risk of incidents, streamlining management and providing safety for drivers.

Called Horus, the solution will be installed on the Herradura, Moscosio, Culebra and Oro Perdido tunnels. It already controls the Renacer tunnel, which was inaugurated in 2016 and 10 other tunnels opened in 2015 between Puente Quetame and Naranjal.

UTC

Related Content

  • November 14, 2013
    Siemens automation for Dutch road tunnel
    In a deal worth around US$16 million, Siemens, in association with local construction company BAM, is supplying the road and tunnel technology for the Leidsche Rijn tunnel in the Dutch city of Utrecht. Siemens will also maintain the installed technology for a period of three years. Handover of the tunnel is scheduled for summer 2015. The 495 metre long tunnel is designed to relieve traffic congestion in the new Leidsche Rijn district which is currently under construction to the west of Utrecht. The new t
  • August 20, 2015
    European tunnel upgrades following new safety legislation
    Across Europe there is a very mixed picture of compliance to latest safety standards for road tunnels. Best practice has emerged, however, in the wake of European legislation. Jon Masters reports High profile fatal fires following accidents in the Mont Blanc, Tauern and Gotthard tunnels prompted the 2004 European Union Directive 2004/54 on road tunnel safety. This meant all EU member states would have to meet new standards of safety in road tunnels by 30 April 2014. The Directive applied to all tunnels over
  • March 2, 2016
    Indra to renew Colombia toll systems
    Concesionaria del Desarrollo Vial de la Sabana (DEVISAB) has awarded Indra a contract valued at US$2.3 million to renovate the technology used at three toll plazas and a control centre on a roadway linking the municipalities of Chia, Mosquera, Girardot and Soacha. The project is scheduled to be completed in 14 months. Indra will deploy toll and electronic toll systems on 21 collection lanes at the toll plazas of Tebaida, Mondoñedo and the Soacha municipality access lane, along a 159-kilometre stretch of
  • November 1, 2013
    California’s new tunnel has safety features inspired by deadly fire
    A fire in the third-bore of the Caldecott tunnel that killed seven in 1982 led to changes to standards for new tunnels, including the new fourth bore which is due to open later this month.