Called Horus, the solution will be installed on the Herradura, Moscosio, Culebra and Oro Perdido tunnels. It already controls the Renacer tunnel, which was inaugurated in 2016 and 10 other tunnels opened in 2015 between Puente Quetame and Naranjal.
Called Horus, the solution will be installed on the Herradura, Moscosio, Culebra and Oro Perdido tunnels. It already controls the Renacer tunnel, which was inaugurated in 2016 and 10 other tunnels opened in 2015 between Puente Quetame and Naranjal.