Skip to main content

Indra tunnel solution used on four tunnels for Bogotá-Villavicencio divided highway project

Indra, Coviandes's principal technology partner on the Bogotá-Villavicencio divided highway project, has implemented its traffic and tunnel solution on four tunnels located between Cáqueza and Puente Quetame, in Columbia. It is designed with the intention of facilitating operation, automating processes, reducing the risk of incidents, streamlining management and providing safety for drivers. Called Horus, the solution will be installed on the Herradura, Moscosio, Culebra and Oro Perdido tunnels. It
November 27, 2017 Read time: 1 min

509 Indra, Coviandes's principal technology partner on the Bogotá-Villavicencio divided highway project, has implemented its traffic and tunnel solution on four tunnels located between Cáqueza and Puente Quetame, in Columbia. It is designed with the intention of facilitating operation, automating processes, reducing the risk of incidents, streamlining management and providing safety for drivers.

Called Horus, the solution will be installed on the Herradura, Moscosio, Culebra and Oro Perdido tunnels. It already controls the Renacer tunnel, which was inaugurated in 2016 and 10 other tunnels opened in 2015 between Puente Quetame and Naranjal.

UTC

Related Content

  • August 14, 2012
    Tunnel network to relieve Istanbul's traffic congestion
    A series of road tunnels is taking shape to help relieve Istanbul from crippling road congestion, with an extensive array of safety and management systems operating from a single ITS platform. Nino Sehagic reports. Traffic in Istanbul has historically been described simply as jammed. Severe congestion and chaotic use of available road space are characteristics of a city of more than one and a half million cars. Istanbul’s existing road network could not cope and was in urgent need of expansion, leading the
  • July 9, 2013
    Indra to implement control centre for Kuala Lumpur LRT and monorail
    Malaysia’s Syarikat Prasarana Negara Berhad (Prasarana), which is responsible for the modernisation of the public transport system in the country, has awarded Indra the contract to design, develop and commission a new integrated control centre for Kuala Lumpur’s monorail and the Ampang and Kelana Jaya light rail transit lines. A new control centre will integrate existing ticketing and passenger information systems, together with all transport lines operated by Prasarana and the mass rapid transit (MRT), the
  • October 10, 2012
    Urban tunnel replaces viaduct, improves safety
    Earthquake sensors, automatic barriers and real time monitoring systems are all part of a scheme to make a major Seattle traffic artery safer, by taking it underground. Huw Williams reports. Seattle’s metropolitan area of 3.5 million people, like much of the western seaboard of the United States, lies in an earthquake zone. In Seattle’s case, the city and its hinterland sit atop a complex network of interrelated active geological faults capable of severe seismic activity and posing complex considerations fo
  • December 11, 2024
    Indra ticketing starts in Riyadh
    New system is part of €266m public transit deal in Saudi Arabian capital