Skip to main content

Indra tunnel solution used on four tunnels for Bogotá-Villavicencio divided highway project

Indra, Coviandes's principal technology partner on the Bogotá-Villavicencio divided highway project, has implemented its traffic and tunnel solution on four tunnels located between Cáqueza and Puente Quetame, in Columbia. It is designed with the intention of facilitating operation, automating processes, reducing the risk of incidents, streamlining management and providing safety for drivers. Called Horus, the solution will be installed on the Herradura, Moscosio, Culebra and Oro Perdido tunnels. It
November 27, 2017 Read time: 1 min

509 Indra, Coviandes's principal technology partner on the Bogotá-Villavicencio divided highway project, has implemented its traffic and tunnel solution on four tunnels located between Cáqueza and Puente Quetame, in Columbia. It is designed with the intention of facilitating operation, automating processes, reducing the risk of incidents, streamlining management and providing safety for drivers.

Called Horus, the solution will be installed on the Herradura, Moscosio, Culebra and Oro Perdido tunnels. It already controls the Renacer tunnel, which was inaugurated in 2016 and 10 other tunnels opened in 2015 between Puente Quetame and Naranjal.

UTC

Related Content

  • August 29, 2019
    Cohda trial proves C-ITS can work in tunnels
    Connected cars require uninterrupted signals to ensure driving safety. Going underground creates problems – but a trial in Norway suggests that there might be light at the end of the tunnel… As connectivity becomes increasingly important for transportation – in particular for connected and autonomous vehicles (C/AVs) - the problem of ‘blackspots’ and dead zones where signals fail or drop out is a pressing one. But developments early this year suggest that advances in technology might be on the brink of d
  • November 12, 2014
    Flir expands Marseille’s tunnel vision
    Marseille’s city authority has added the monitoring of a second tunnel to the existing network with a new approach towards video management. Measuring 1.5km in length, the double-deck Prado Sud tunnel extends Marseille’s existing 2.5km Prado Carénage tunnel towards the southern part of the city. While it was logical to use a common control room and to use the latest detection and monitoring systems in the new tunnel, it was deemed too disruptive and costly to completely upgrade the existing tunnel.
  • March 2, 2012
    Traficon AID deployed on Busan-Geoje fixed link project
    Traficon, an exhibitor at this week’s 17th ITS World Congress in Busan, South Korea, has revealed that the company’s involvement with the city will continue long after the event closes.
  • June 11, 2014
    Nevada high speed tunnel gets intelligent lighting control
    Quebec-based tunnel lighting specialist Nyx Hemera has completed the installation of its tunnel lighting addressable control system (TLACS) in the Carlin Tunnel, Nevada, USA, claimed to be the first highway rated speed tunnel in North America to be fully lighted with LEDs. Located in north-eastern Nevada and crossing over the Humbolt River, the quarter-mile long Carlin tunnel runs through an approximately US$31 million refurbishment project and includes enhanced roadway drainage, new concrete near tunne