Skip to main content

Indra supervises 9km tunnel in Columbia

Indra and engineering firm Eléctricas de Medellín Ingeniería y Servicios has commissioned a control centre and a back-up centre to supervise a 9km tunnel in Columbia. Both centres will monitor the safety and revenue collection systems of the Túnel de Oriente, which serves as a transport link between the city of Medellín and José María Córdoba airport. It is part of Concesión Túnel Aburrá Oriente, a 24km road corridor that Indra is now managing via its Mova solutions. Indra says its toll solution Mova C
September 3, 2019 Read time: 2 mins

509 Indra and engineering firm Eléctricas de Medellín Ingeniería y Servicios has commissioned a control centre and a back-up centre to supervise a 9km tunnel in Columbia.

Both centres will monitor the safety and revenue collection systems of the Túnel de Oriente, which serves as a transport link between the city of Medellín and José María Córdoba airport.

It is part of Concesión Túnel Aburrá Oriente, a 24km road corridor that Indra is now managing via its Mova solutions.

Indra says its toll solution Mova Collect allows vehicles to travel without stopping at speeds of up to 60km per hour, cutting travel times between Rio Negro airport and Medelin from 45 to 18 minutes.

Additionally, the 7541 Horus tunnel platform is expected to provide operators with information on everything occurring on the highway while variable message signs offer information on road conditions to drivers.

According to Indra, air quality measurement systems and carbon monoxide sensors detect high levels of toxic gases in real-time and activate fans to expel pollutants.

The project also includes the installation of communication systems, safety systems, CCTV, traffic counters, road signage, lighting control and a loudspeaker system.

For more information on companies in this article

Related Content

  • Project of the year win for TransCore Silicon Valley project
    February 27, 2013
    Santa Clara Valley Transportation Authority’s (VTA) State Route (SR) 237 Express Lanes, for which TransCore serves as lead integrator, received the 2012 Transportation Project of the Year Award from the San Francisco Bay Area Institute of Transportation Engineers (ITE). VTA is implementing the Silicon Valley Express Lanes Program to provide congestion relief in one of its major Bay Area commuter corridors. As part of the program, the SR 237, US 101, SR 85 and parts of I-680 corridor will convert the existin
  • Air quality tops transportation agendas
    November 17, 2014
    Colin Sowman catches up on some of the latest research around outdoor pollution and looks at options available to authorities in areas of poor air quality. Iair quality hasn’t already reached the top of the agenda in transportation department meetings in your area, it probably soon will with national, trans-national and even global bodies calling for authorities to reduce pollution levels.
  • Jenoptik supplies sophisticated multi-section control project
    November 17, 2014
    Efficient speed enforcement in the most highly frequented tunnel in Austria on the A7 near Linz. The Bindermichl-Niedernhart tunnel complex on Austrian highway A7 connects the major east/west A1 route from Vienna/ Bratislava to Munich/Salzburg with the A7/ E55 running south from Prague in the Czech Republic. This happens right in the middle of the city of Linz, Austria.
  • Indra launches Air Drones solution to manage UAV traffic
    March 13, 2019
    Indra is launching Air Drones, a set of solutions for managing air traffic for unmanned aerial vehicles (UAV) at local, regional and national territories. The company says Air Drones is designed to ensure the safety of air operations for drones that fly in densely populated urban environments, rural areas and near airports, where security requirements are strict. Indra’s new Unmanned Traffic Management (UTM) system will organise all the traffic, identifying each aircraft and controlling its access a