Skip to main content

Indra supervises 9km tunnel in Columbia

Indra and engineering firm Eléctricas de Medellín Ingeniería y Servicios has commissioned a control centre and a back-up centre to supervise a 9km tunnel in Columbia. Both centres will monitor the safety and revenue collection systems of the Túnel de Oriente, which serves as a transport link between the city of Medellín and José María Córdoba airport. It is part of Concesión Túnel Aburrá Oriente, a 24km road corridor that Indra is now managing via its Mova solutions. Indra says its toll solution Mova C
September 3, 2019 Read time: 2 mins

509 Indra and engineering firm Eléctricas de Medellín Ingeniería y Servicios has commissioned a control centre and a back-up centre to supervise a 9km tunnel in Columbia.

Both centres will monitor the safety and revenue collection systems of the Túnel de Oriente, which serves as a transport link between the city of Medellín and José María Córdoba airport.

It is part of Concesión Túnel Aburrá Oriente, a 24km road corridor that Indra is now managing via its Mova solutions.

Indra says its toll solution Mova Collect allows vehicles to travel without stopping at speeds of up to 60km per hour, cutting travel times between Rio Negro airport and Medelin from 45 to 18 minutes.

Additionally, the 7541 Horus tunnel platform is expected to provide operators with information on everything occurring on the highway while variable message signs offer information on road conditions to drivers.

According to Indra, air quality measurement systems and carbon monoxide sensors detect high levels of toxic gases in real-time and activate fans to expel pollutants.

The project also includes the installation of communication systems, safety systems, CCTV, traffic counters, road signage, lighting control and a loudspeaker system.

For more information on companies in this article

Related Content

  • Indra-Alstom to install tunnel security systems for Spanish high-speed rail link
    October 22, 2015
    A consortium of Indra and Alstom España has won the contract to install public safety and security systems in the six tunnels on the high-speed rail link connecting Antequera and Granada in Spain. The contract also includes system maintenance for a period of 42 months. Over 100 km long, the rail link represents a key infrastructure in the development of the Andalusian Crossrail Project and forms part of the Trans-European Transport Network as one of the priority networks for improving passenger and cargo
  • Sony’s vision systems help limit risk in road tunnels
    November 10, 2017
    Sony’s Stephane Clauss looks at the imaging requirements in tunnels. In the event of a fire inside a tunnel, the dispersion of gases and heat is prevented, creating extreme temperatures that have led to many deaths. Following tragic incidents including Mont Blanc, European legislation requires longer tunnels to be fitted with incident and smoke detection systems.
  • Bluetooth and Wi-Fi offer new options for travel time measurements
    November 20, 2013
    New trials show Bluetooth and Wi-Fi signals can be reliably used for measuring travel times and at a lower cost than an ANPR system, but which is the better proposition depends on many factors. Measuring travel times has traditionally relied automatic number plate (or licence plate) recognition (ANPR/ALPR) cameras capturing the progress of vehicles travelling along a pre-defined route. Such systems also have the benefit of being able to count passing traffic and have become a vital tool in dealing with c
  • Green Light WIM
    July 30, 2012
    Beginning in the 1990s, Oregon was one of the first US states to use weigh-in-motion scales and transponder-based systems to enable trucks to avoid having to stop at weigh stations. Its Green Light preclearance system soon became a model for similar deployments throughout the country. Today, Green Light annually weighs and screens 1.6 million trucks as they approach 21 Oregon weigh stations and it preclears 1.5 million of them.