Skip to main content

Indra supervises 9km tunnel in Columbia

Indra and engineering firm Eléctricas de Medellín Ingeniería y Servicios has commissioned a control centre and a back-up centre to supervise a 9km tunnel in Columbia. Both centres will monitor the safety and revenue collection systems of the Túnel de Oriente, which serves as a transport link between the city of Medellín and José María Córdoba airport. It is part of Concesión Túnel Aburrá Oriente, a 24km road corridor that Indra is now managing via its Mova solutions. Indra says its toll solution Mova C
September 3, 2019 Read time: 2 mins

509 Indra and engineering firm Eléctricas de Medellín Ingeniería y Servicios has commissioned a control centre and a back-up centre to supervise a 9km tunnel in Columbia.

Both centres will monitor the safety and revenue collection systems of the Túnel de Oriente, which serves as a transport link between the city of Medellín and José María Córdoba airport.

It is part of Concesión Túnel Aburrá Oriente, a 24km road corridor that Indra is now managing via its Mova solutions.

Indra says its toll solution Mova Collect allows vehicles to travel without stopping at speeds of up to 60km per hour, cutting travel times between Rio Negro airport and Medelin from 45 to 18 minutes.

Additionally, the 7541 Horus tunnel platform is expected to provide operators with information on everything occurring on the highway while variable message signs offer information on road conditions to drivers.

According to Indra, air quality measurement systems and carbon monoxide sensors detect high levels of toxic gases in real-time and activate fans to expel pollutants.

The project also includes the installation of communication systems, safety systems, CCTV, traffic counters, road signage, lighting control and a loudspeaker system.

For more information on companies in this article

Related Content

  • Indra to modernise London’s Tunnels Control Centre
    September 17, 2014
    Transport for London (TfL) has appointed Indra to modernise the technology for the control and operation of the 12 road tunnels in London and 90 kilometres of approach roads.
  • Indra to modernise London’s Tunnels Control Centre
    September 17, 2014
    Transport for London (TfL) has appointed Indra to modernise the technology for the control and operation of the 12 road tunnels in London and 90 kilometres of approach roads.
  • Telvent awarded Saudi Arabia traffic management contract
    March 1, 2012
    Telvent has been awarded a contract by Saudi Oger Ltd, with the High Commission for the Development of Arriyadh as the end customer, to implement the its SmartMobility Road Suite solution on King Abdullah Road in Saudi Arabia.
  • Indra to renew Colombia toll systems
    March 2, 2016
    Concesionaria del Desarrollo Vial de la Sabana (DEVISAB) has awarded Indra a contract valued at US$2.3 million to renovate the technology used at three toll plazas and a control centre on a roadway linking the municipalities of Chia, Mosquera, Girardot and Soacha. The project is scheduled to be completed in 14 months. Indra will deploy toll and electronic toll systems on 21 collection lanes at the toll plazas of Tebaida, Mondoñedo and the Soacha municipality access lane, along a 159-kilometre stretch of