Skip to main content

Indra to modernise London’s Tunnels Control Centre

Transport for London (TfL) has appointed Indra to modernise the technology for the control and operation of the 12 road tunnels in London and 90 kilometres of approach roads.
September 17, 2014 Read time: 2 mins

 1466 Transport for London (TfL) has appointed 509 Indra to modernise the technology for the control and operation of the 12 road tunnels in London and 90 kilometres of approach roads.

The new contract covers the design, installation, commissioning and maintenance of a new integrated system to support the London Streets Tunnels Operations Control Centre (LSTOC).

Currently, LSTOC uses multiple control systems to operate and control safety and traffic control systems, communicate with road users, emergency and maintenance services people and to manage safety and minimise disruption. This upgrade will provide a single, future-proofed intelligent system which can allow for further upgrades not previously possible, along with new control room equipment.

The new system will improve how real-time information is presented to and used by LSTOC and the London Streets Traffic Control Centre (LSTCC), who work with other incident responders such as the emergency services to deal with traffic incidents. These improvements will also allow for real-time information about incidents in the tunnels to be obtained, allowing TfL to minimise the knock-on effects these can cause across London’s streets.

Dana Skelley, director of Roads at TfL, said: “This new system will help to improve the safety and efficiency of all the tunnels that we manage in London. This is part of our wider programme of investing in tunnel improvements and roads as a whole.

“We are committed to keeping London moving and this is just another step to making sure that people can get around quickly and safely.”

Enrique Sánchez Candorcio, director of Indra UK, said: "Indra will provide TfL with state-of-the-art technology to manage the city's tunnels in an integrated manner, thanks to a unique solution that will be designed to incorporate new systems in the future. This project will allow us to put our vast experience in smart transportation infrastructures to good use in London.

For more information on companies in this article

Related Content

  • USDOT announces next generation CV funding
    September 15, 2015
    US Transportation Secretary Anthony Foxx has revealed that New York City, Wyoming, and Tampa will receive up to US$42 million to pilot next-generation technology in infrastructure and in vehicles to share and communicate anonymous information with each other and their surroundings in real time, reducing congestion and greenhouse gas emissions and cutting the unimpaired vehicle crash rate by 80 per cent. As part of the Department of Transportation (USDOT) national connected vehicle pilot deployment progra
  • Crossing the line: managing traffic across jurisdictions
    June 18, 2024
    The US will eventually have a fully-digitised transportation network, with traffic management devices talking to each other across massive distances. It’s really a question of pain points on the road to full deployment, explains Mark Talbot of Q-Free
  • Russia 2018 World Cup: ITS can win it
    June 5, 2018
    Teams and supporters will cover vast distances in Russia for the 2018 FIFA World Cup. Stephane Clauss from Sony Europe’s Image Sensing Solutions division examines how the latest camera technologies can be deployed to help things run smoothly over the next month or so... For one month, from June 14, Russia is hosting the 2018 FIFA World Cup. This is the largest country in the world and the distances between venues will be larger than at almost any other World Cup - bar the finals in the US and Brazil.
  • London to benefit from major roads programme
    March 4, 2014
    Dozens of locations across the UK capital are set to be transformed in a US$6.7 billion programme as part of the largest investment in the capital’s road and street network in a generation. In response to the recommendations of the Mayor’s Roads Task Force, a total of 50 projects are now underway. Alongside the transformation of 33 of London’s biggest and nastiest road junctions announced last week as part of the Mayor’s cycling programme, there will also be more than US$334 million of additional far-re