Skip to main content

Indra to modernise London’s Tunnels Control Centre

Transport for London (TfL) has appointed Indra to modernise the technology for the control and operation of the 12 road tunnels in London and 90 kilometres of approach roads.
September 17, 2014 Read time: 2 mins

 1466 Transport for London (TfL) has appointed 509 Indra to modernise the technology for the control and operation of the 12 road tunnels in London and 90 kilometres of approach roads.

The new contract covers the design, installation, commissioning and maintenance of a new integrated system to support the London Streets Tunnels Operations Control Centre (LSTOC).

Currently, LSTOC uses multiple control systems to operate and control safety and traffic control systems, communicate with road users, emergency and maintenance services people and to manage safety and minimise disruption. This upgrade will provide a single, future-proofed intelligent system which can allow for further upgrades not previously possible, along with new control room equipment.

The new system will improve how real-time information is presented to and used by LSTOC and the London Streets Traffic Control Centre (LSTCC), who work with other incident responders such as the emergency services to deal with traffic incidents. These improvements will also allow for real-time information about incidents in the tunnels to be obtained, allowing TfL to minimise the knock-on effects these can cause across London’s streets.

Dana Skelley, director of Roads at TfL, said: “This new system will help to improve the safety and efficiency of all the tunnels that we manage in London. This is part of our wider programme of investing in tunnel improvements and roads as a whole.

“We are committed to keeping London moving and this is just another step to making sure that people can get around quickly and safely.”

Enrique Sánchez Candorcio, director of Indra UK, said: "Indra will provide TfL with state-of-the-art technology to manage the city's tunnels in an integrated manner, thanks to a unique solution that will be designed to incorporate new systems in the future. This project will allow us to put our vast experience in smart transportation infrastructures to good use in London.

For more information on companies in this article

Related Content

  • Los Angeles Express Lanes links multiple modes of transportation
    January 25, 2012
    The Big Apple's loss is the City of Angels's gain, according to Ken Philmus
  • Traficon incident detection technology deployed in Dartford tunnel
    June 26, 2012
    Traficon has been awarded a contract to provide 70 VIP-IP video image processing boards for installation in the Dartford tunnel on London’s M25 orbital motorway. The technology will be installed in collaboration with Vital Technology Ltd, and will provide extensive automatic incident detection (AID) capabilities, including the detection of stopped vehicles and smoke detection. The Dartford - Thurrock river crossing is one of Europe's most heavily used crossings and complex traffic management systems. An ave
  • Belgium’s Flemish Region to deploy smart highway lighting
    April 16, 2015
    Agentschap Wegen en Verkeer (AWV), which manages the Flemish Region's highway network on behalf of the Flemish Minister for Mobility and Public Works has awarded information technology firm CGI and partner SPIE Belgium to modernise the remote management of highway lighting within the Flemish Region. CGI's IBOR platform, which is capable of being managed remotely, will replace current highway lighting management systems used within the Region. IBOR is an intelligent solution that connects and controls dy
  • Sony cameras and video analysis advance road tunnel safety in Sweden
    May 16, 2012
    Road tunnels are a particularly dangerous environment. Not only do fires burn more violently in enclosed environments, as happened in the 1999 Mont Blanc tunnel disaster, the low lighting and confined reaction space mean accidents are more likely to happen. Authorities must, therefore, be easily and quickly alerted to accidents, breakdowns and equipment must be working at all time.