Skip to main content

Indra to manage traffic at seven tunnels in Colombia

Indra is to deploy its Horus traffic management platform to control seven tunnels and open-air roads in Colombia.
November 13, 2019 Read time: 2 mins

The €20 million contract on the final section of the Bogotá-Villavicencio Corridor includes the Buenavista tunnel - which at 4,559m long is one of the longest in Latin America.

The company claims Horus allows users to manage several ITS and safety systems and offers real-time information on everything happening in a tunnel.

The solution’s automatic detection system is expected to integrate information from cameras and sensors to send alerts to the control centre in the event of an incident or emergency. Air quality measurement systems and carbon monoxide sensors detect high levels of toxic gases in real-time and activate fans to expel pollution outside, the company adds.

According to Indra, the solution’s radio system enables geofencing of the location of ambulances, firefighters, police and operation and maintenance vehicles inside and outside the tunnels.

The project will complete the Bogotá-Villavicencio two-lane road highway, in which Horus is already being used to manage 22 tunnels. The addition of seven more tunnels will connect the two cities in a bid to reduce travel time by 45 minutes.

As part of the deal, Indra will renovate the control centre in the municipality of Buenavista to help the nearby centres in Boquerón and Naranja monitor and control traffic.

The project includes the installation of communication systems such as Mova Comms, Mova Protect, ITS, CCTV, traffic counters, road signs, emergency call boxes, fire detection, lighting control and PA systems.

Indra was awarded the contract in a consortium with infrastructure and engineering firm Comsa Industrial through the Andean Road Consortium - which is responsible for the construction of a road between the towns of Chirajara and Fundadores, known as the Los Llanos highway.

For more information on companies in this article

Related Content

  • $150m traffic deal for Siemens in Florida
    June 19, 2020
    Contract expands Germany-based multinational's footprint in Sunshine State
  • Thales to deliver signalling system for southern Gotthard extension
    September 19, 2016
    Following completion of the Gotthard tunnel, AlpTransit Gotthard has awarded Thales a US$64 million (€57 million) signalling contract for the new Ceneri tunnel, the final section of the transalpine rail corridor that will link Zurich and Milan in less than three hours journey time. Located 25 km south of the Gotthard tunnel, the Ceneri Base Tunnel between Bellinzona and Lugano in Switzerland is 15.4 km long and, like the Gotthard tunnel, comprises two single-track tubes separated by a space of 40 metres
  • Cost benefit: Toronto retimings tame traffic trauma
    July 19, 2018
    Canada’s largest city reckons that it is saving its taxpayers’ money simply by altering the way traffic lights work. David Crawford reviews Toronto’s ambitious plans to ease congestion Toronto, Canada’s largest metropolis (and the fourth largest in North America), has saved its residents CAN$53 (US$42.4) for every CAN$1 (US$0.80) spent over a 2012-2016 traffic signal retiming programme, according to figures released by its Transportation Services Division. The programme covered 1,275 signals (the city’s
  • Speeding ambulances through borders
    October 26, 2016
    David Crawford sees hope for stricken patients on the wrong side of the border. In treating patients with heart or stroke conditions, speed is of the essence.