Skip to main content

Indra to manage traffic at seven tunnels in Colombia

Indra is to deploy its Horus traffic management platform to control seven tunnels and open-air roads in Colombia.
November 13, 2019 Read time: 2 mins

The €20 million contract on the final section of the Bogotá-Villavicencio Corridor includes the Buenavista tunnel - which at 4,559m long is one of the longest in Latin America.

The company claims Horus allows users to manage several ITS and safety systems and offers real-time information on everything happening in a tunnel.

The solution’s automatic detection system is expected to integrate information from cameras and sensors to send alerts to the control centre in the event of an incident or emergency. Air quality measurement systems and carbon monoxide sensors detect high levels of toxic gases in real-time and activate fans to expel pollution outside, the company adds.

According to Indra, the solution’s radio system enables geofencing of the location of ambulances, firefighters, police and operation and maintenance vehicles inside and outside the tunnels.

The project will complete the Bogotá-Villavicencio two-lane road highway, in which Horus is already being used to manage 22 tunnels. The addition of seven more tunnels will connect the two cities in a bid to reduce travel time by 45 minutes.

As part of the deal, Indra will renovate the control centre in the municipality of Buenavista to help the nearby centres in Boquerón and Naranja monitor and control traffic.

The project includes the installation of communication systems such as Mova Comms, Mova Protect, ITS, CCTV, traffic counters, road signs, emergency call boxes, fire detection, lighting control and PA systems.

Indra was awarded the contract in a consortium with infrastructure and engineering firm Comsa Industrial through the Andean Road Consortium - which is responsible for the construction of a road between the towns of Chirajara and Fundadores, known as the Los Llanos highway.

UTC

Related Content

  • May 16, 2022
    Indra AI helps Israel traffic flow
    €24m dynamic tolling contract for Ayalon Highway includes 80 free-flow booths to ease jams
  • September 12, 2012
    Success of Kuala Lumpur's dual purpose tunnel
    Malaysia’s capital boasts a unique piece of infrastructure; a combined stormwater and motorway tunnel, the longest multi-purpose tunnel in the world. Kuala Lumpur’s Stormwater Management and Road Tunnel (Smart) was conceived as a project under the Malaysian Federal Government to alleviate the flooding problem in the city centre. Although a booming city and the nerve centre for Malaysia’s economy, KL was built along the flood plains of the Klang River and, since its earliest days has been subjected to floodi
  • April 4, 2023
    Sice systems future proof Fehmarnbelt Tunnel
    Picking up the electro-mechanical contract for the Fehmarnbelt Tunnel was a milestone, according to David Calero Monteagudo, head of global ITS and tunnel business for Spanish company Sice. David Arminas finds out more
  • September 15, 2014
    Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in