Skip to main content

Indra to manage traffic at seven tunnels in Colombia

Indra is to deploy its Horus traffic management platform to control seven tunnels and open-air roads in Colombia.
November 13, 2019 Read time: 2 mins

The €20 million contract on the final section of the Bogotá-Villavicencio Corridor includes the Buenavista tunnel - which at 4,559m long is one of the longest in Latin America.

The company claims Horus allows users to manage several ITS and safety systems and offers real-time information on everything happening in a tunnel.

The solution’s automatic detection system is expected to integrate information from cameras and sensors to send alerts to the control centre in the event of an incident or emergency. Air quality measurement systems and carbon monoxide sensors detect high levels of toxic gases in real-time and activate fans to expel pollution outside, the company adds.

According to Indra, the solution’s radio system enables geofencing of the location of ambulances, firefighters, police and operation and maintenance vehicles inside and outside the tunnels.

The project will complete the Bogotá-Villavicencio two-lane road highway, in which Horus is already being used to manage 22 tunnels. The addition of seven more tunnels will connect the two cities in a bid to reduce travel time by 45 minutes.

As part of the deal, Indra will renovate the control centre in the municipality of Buenavista to help the nearby centres in Boquerón and Naranja monitor and control traffic.

The project includes the installation of communication systems such as Mova Comms, Mova Protect, ITS, CCTV, traffic counters, road signs, emergency call boxes, fire detection, lighting control and PA systems.

Indra was awarded the contract in a consortium with infrastructure and engineering firm Comsa Industrial through the Andean Road Consortium - which is responsible for the construction of a road between the towns of Chirajara and Fundadores, known as the Los Llanos highway.

For more information on companies in this article

Related Content

  • ETC Corporation awarded $88 million tolling contract
    March 23, 2012
    The Port Authority of New York and New Jersey has awarded a contract, valued at approximately $88 million, to Electronic Transaction Consultants Corporation (ETC Corporation) to provide a facility-wide replacement toll collection and audit system as well as related system maintenance services. Under the contract, ETC will implement its latest generation Rite solution on the Port Authority’s toll facilities to deliver a number of advanced system features including a sophisticated toll data warehouse, an adva
  • Connected citizens boosts Boston’s traffic management
    March 30, 2017
    Data-derived traffic management is starting to show benefits as David Crawford discovers. The city of Boston has been facing growing congestion problems in its Seaport regeneration district, with the rate of commercial and residential growth threatening to overtake the capacity of the road network to respond.
  • Siemens automation for Dutch road tunnel
    November 14, 2013
    In a deal worth around US$16 million, Siemens, in association with local construction company BAM, is supplying the road and tunnel technology for the Leidsche Rijn tunnel in the Dutch city of Utrecht. Siemens will also maintain the installed technology for a period of three years. Handover of the tunnel is scheduled for summer 2015. The 495 metre long tunnel is designed to relieve traffic congestion in the new Leidsche Rijn district which is currently under construction to the west of Utrecht. The new t
  • Urban tunnel replaces viaduct, improves safety
    October 10, 2012
    Earthquake sensors, automatic barriers and real time monitoring systems are all part of a scheme to make a major Seattle traffic artery safer, by taking it underground. Huw Williams reports. Seattle’s metropolitan area of 3.5 million people, like much of the western seaboard of the United States, lies in an earthquake zone. In Seattle’s case, the city and its hinterland sit atop a complex network of interrelated active geological faults capable of severe seismic activity and posing complex considerations fo