Skip to main content

Indra to manage traffic at seven tunnels in Colombia

Indra is to deploy its Horus traffic management platform to control seven tunnels and open-air roads in Colombia.
November 13, 2019 Read time: 2 mins

The €20 million contract on the final section of the Bogotá-Villavicencio Corridor includes the Buenavista tunnel - which at 4,559m long is one of the longest in Latin America.

The company claims Horus allows users to manage several ITS and safety systems and offers real-time information on everything happening in a tunnel.

The solution’s automatic detection system is expected to integrate information from cameras and sensors to send alerts to the control centre in the event of an incident or emergency. Air quality measurement systems and carbon monoxide sensors detect high levels of toxic gases in real-time and activate fans to expel pollution outside, the company adds.

According to Indra, the solution’s radio system enables geofencing of the location of ambulances, firefighters, police and operation and maintenance vehicles inside and outside the tunnels.

The project will complete the Bogotá-Villavicencio two-lane road highway, in which Horus is already being used to manage 22 tunnels. The addition of seven more tunnels will connect the two cities in a bid to reduce travel time by 45 minutes.

As part of the deal, Indra will renovate the control centre in the municipality of Buenavista to help the nearby centres in Boquerón and Naranja monitor and control traffic.

The project includes the installation of communication systems such as Mova Comms, Mova Protect, ITS, CCTV, traffic counters, road signs, emergency call boxes, fire detection, lighting control and PA systems.

Indra was awarded the contract in a consortium with infrastructure and engineering firm Comsa Industrial through the Andean Road Consortium - which is responsible for the construction of a road between the towns of Chirajara and Fundadores, known as the Los Llanos highway.

For more information on companies in this article

Related Content

  • Toll performance exceeds expectations, improves travel times
    January 30, 2012
    Jean Harito, Attica Tollway Operations Authority and Steve Morello, Egis Projects describe how looking to exceed contractual obligations makes good operational and business sense. The Attica Tollway is a modern, 65km, access-controlled urban motorway with three lanes in each direction. It constitutes the ring road around the extensive metropolitan area of the Greek capital, Athens, and forms the backbone of the entire road network in the Attica region. By ensuring freeflow operating conditions, the Attica T
  • Gotthard Base Tunnel opens in Switzerland
    June 1, 2016
    After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour. The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will al
  • Indra speeds Madrid metro ticketing
    April 14, 2021
    Indra's ticketing system prototypes to enable contactless payments in Spanish capital
  • Keeping over-height and overheating vehicles out of tunnels
    October 7, 2013
    A review of pre-warning solutions for problematic commercial vehicles approaching tunnels