Skip to main content

Ideagen software used by ConnectPlus for M25 project

UK technology company Ideagen's Coruson software will be utilised by ConnectPlus consortium to improve safety, quality and environmental processes for the renewal of the M25 motorway. Around 650 users will report into the quality management system. ConnectPlus is managing the 25-year phase of the Design, Build, Finance and Operate upgrade and maintenance project. The firm helps supervise subcontractors as well as provide maintenance work and small improvement schemes. Phillip Ross, head of health, sa
June 4, 2018 Read time: 2 mins
UK technology company Ideagen's Coruson software will be utilised by ConnectPlus consortium to improve safety, quality and environmental processes for the renewal of the M25 motorway. Around 650 users will report into the quality management system.


ConnectPlus is managing the 25-year phase of the Design, Build, Finance and Operate upgrade and maintenance project. The firm helps supervise subcontractors as well as provide maintenance work and small improvement schemes.

Phillip Ross, head of health, safety, environment and quality at ConnectPlus, says the contract focuses on processes such as repairing potholes in the road or procedures for completing actual payments.

“This project will be about modernising these processes and using an electronic, modern system to access, manage and maintain them going forward”, Ross adds.

The initiative started in 2009 and comprises around 400km of carriageway. The motorway has expanded from three to four lanes between junctions 16-23 and 27-30 to help ease congestion.

ConnectPlus consortium members include 3902 Balfour Beatty, 1414 Egis Road Operation UK and Edge Orbital Holdings.

For more information on companies in this article

Related Content

  • Congestion relief for Liverpool’s busy roads
    November 27, 2013
    Congestion on some of Liverpool’s busiest roads is set to be eased, thanks to US$29 million improvement works. Transport Minister Baroness Kramer has given approval for work on the A5758 Broom’s Cross road scheme to start. The Department of Transport will provide a maximum of US$23 million towards the full scheme cost of US$29 million. Baroness Kramer said: “This scheme will ease congestion and cut pollution on some of Sefton’s busiest roads. The US$23 million we are putting into this project shows t
  • London’s strategy to tackle air quality problems
    October 21, 2014
    Colin Sowman talks to Matthew Pencharz, the man charged with charting London’s path between catering for traveller needs, conserving ancient buildings and conforming to modern air quality standards.
  • Telensa lights up Hertfordshire
    November 27, 2014
    More than 12,600 street lights on Hertfordshire’s A-roads are being upgraded to LED lighting using Telensa’s PLANet street light central management system (CMS), which will allow the lights to be monitored from a central point. This will reduce inspection costs and make it easier to spot and repair any faults. The system will also allow lighting levels on the A-roads to be reduced during the night, rather than turning lights off completely. Once the new lights are installed, light levels will be reduced
  • London needs just one road user charge, says report
    July 8, 2019
    London’s patchwork of road charging schemes should be replaced by a single, distance-based user charge, according to new research. Apart from anything else, it would be much fairer… The UK capital’s multiple road charging schemes require a radical overhaul, according to a new report by the Centre for London thinktank. The suggested solution is to replace existing levies on drivers with a single, distance-based user charge which would more fairly reflect how much, and at what time, people are using London