Skip to main content

Highways England showcases progress on high tech corridor project

Highways England is leading a project to establish a high tech corridor on the A2/M2 in Kent which will allow specially-equipped vehicles to interact with roadside infrastructure. As part of the initiative, Highways England hosted a week-long Testfest event in Chatham, Kent, this week, showing how test vehicles receive information on road conditions, road works and the time left for traffic lights to change to green via a wireless network. Jo White, head of Highways England’s intelligent transport system
October 12, 2018 Read time: 2 mins
8101 Highways England is leading a project to establish a high tech corridor on the A2/M2 in Kent which will allow specially-equipped vehicles to interact with roadside infrastructure.


As part of the initiative, Highways England hosted a week-long Testfest event in Chatham, Kent, this week, showing how test vehicles receive information on road conditions, road works and the time left for traffic lights to change to green via a wireless network.

Jo White, head of Highways England’s intelligent transport systems group, says: “We are looking at ITS G5, a short-range Wi-Fi technology, and cellular technology, and are interested in how they deliver information to the vehicle.”  

As part of Testfest, ITS International travelled in a trial run of a specially-equipped people carrier along a section of the M2, which demonstrated how information is received by the onboard unit and displayed as icons on a screen behind the wheel.

For example, 60mph icons serve as a consistent reminder of the correct speed limit, while roadworks warnings can be followed by lane divert messages.

Highways England says the screens can help reduce the probability of drivers missing information displayed on roadside signs. It also provides drivers and fleet managers with information to make real-time decisions could potentially improve traffic flow along the corridor.

White believes the speed limit information could provide Highways England with more flexibility of where and when to sign information, potentially freeing it from dependence on physical infrastructure in the future.

The M2 demonstration included a simulated border in which the driver received information between two areas labelled Country A and Country B.

White says drivers can receive information from their ‘home country’ and then pass over the border and continue to receive relevant journey data. This is achieved using the driver’s existing service provider to transmit the data from the country to the in-vehicle device.

Other partners involved in the project include the 1837 Department for Transport, 1466 Transport for London and 2222 Kent County Council. This consortium is part of InterCor, a European Union programme which aims to test services which work across borders, connecting the Netherlands, France and Belgium.

The project is scheduled to be complete in 2019.

For more information on companies in this article

Related Content

  • Island Radar: safely crossing continents
    August 6, 2020
    There is a safety flashpoint wherever roads cross over railways. Island Radar is using well-established traffic technology to keep all parties safe from harm.
  • UK's first tram train en route to Sheffield
    November 25, 2015
    THE UK’S first tram train vehicle has started its journey to Sheffield from Spain. The fully-constructed, 37m long tram train will make a two week voyage over land and sea from Valencia before arriving in South Yorkshire on 1 December. Passengers in the county will be the first in the UK to benefit from the innovative new tram train, a tram-type vehicle that has the signalling, power supply, control and communication technology to run on both street tram lines and the rail network.
  • EU releases first transport infrastructure funds
    April 8, 2014
    Following its decision in March to make the first US$16.4 billion tranche of funding available for trans-European transport network projects, the European commission has now adopted the first work programmes within this framework: a multi-annual work programme covering larger projects with a total budget of US$15.1 billion and an annual work programme for 2014 addressing smaller projects with a budget of US1.3 billion. The funding priorities set out in these programmes include: The closing of missing lin
  • Seven things you may not know about Wales’ new 20mph default speed limit
    October 7, 2022
    Improved road safety and environmental benefits are key reasons for 20mph (30km/h) limit