Skip to main content

Highways England pilots project to reduce congestion along M62

Highways England (HE) has begun piloting a £7 million ($9 million) project to reduce congestion at the Croft Interchange – where junction 21a of the M6 meets junction 10 of the M62, near Warrington, Cheshire. The project aims to provide drivers with smoother and more reliable journey times.
November 13, 2017 Read time: 2 mins
8101 Highways England (HE) has begun piloting a £7 million ($9 million) project to reduce congestion at the Croft Interchange – where junction 21a of the M6 meets junction 10 of the M62, near Warrington, Cheshire. The project aims to provide drivers with smoother and more reliable journey times.


Once the testing is completed in December / January, electronic information signs and variable mandatory speed limits on the M62 will combine with traffic lights on the motorway link roads from the M6.

In the first phase of the motorway to motorway system, drivers travelling between Junction 9 and Junction 11 of the Eastbound M62 will see the electronic variable message signs in operation, which will display mandatory variable speed limits and other information such as warnings of congestion.

Phase two will see the traffic lights switched on at the end of the link roads onto the eastbound M62. Traffic leaving the M6 will be monitored, and the lights will be controlled to minimise queuing onto the M6.

Money for the project is coming from a £150 million ($114 million) innovation fund, part of the £15 billion ($11 million) allocated to HE in the Government’s 2015 to 2020 Road Investment Strategy.

Andy Withington, HE’s programme delivery manager for the North West, said: “The key aim of the project is to test the novel technology introduced through this pilot project and tackle congestion at peak travel times, especially during the morning rush hour. The link road traffic lights won’t be on all of the time, being limited to the morning peak, but the variable speed limit signs on the M62 eastbound will be working all the time when traffic conditions dictate.

Therefore, when the system is operating, drivers will be expected to obey the traffic lights on the link roads and variable mandatory speed limits displayed on the new M62 electronic signs.”

UTC

Related Content

  • January 15, 2014
    South west’s first smart motorway opens
    The first smart motorway scheme in the UK’s south west has been officially launched, covering seven miles of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5. It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods. The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and
  • January 17, 2018
    Mott Macdonald to develop Highways England’s Operations Centre
    Mott Macdonald (MM) has been selected to deliver an intelligent asset monitoring and management system to support the development of Highways England’s (HE’s) technology operations Centre. The project intends to provide a more efficient system of electronic traffic management, enabling HE to centralise operational decision-making, providing data that informs demand models, predicts future needs and identifies areas for investment. As part of the Technology Operations Centre contract (T TOC), Fujitsu will
  • November 23, 2017
    Mobility pricing offers new tools for managing mobility
    Mobility pricing is the best way of sustaining and enhancing mobility, argues Moving Forward Consulting’s Josef Czako. Mobility pricing (MP) is effectively the culmination of the ‘user pays’ principle and has been referred to in many policy discussions about electronic toll collection, road user charging (RUC), and pricing. MP not only reflects the ‘use more, pay more’ nature of RUC, it also takes account of the external cost of journeys including pollution, noise, the cost of congestion and accidents.
  • March 16, 2017
    Canada looks to HOT lanes to tackle congestion
    David Crawford sees an evidence-based approach to HOT lane conversions. Canada’s first high occupancy toll (HOT) lanes opened on 16 September 2016 as a pilot on a 16.5km section of existing high occupancy vehicle (HOV) lanes running in both directions along Toronto’s Queen Elizabeth Way. Promised in two recent budgets