Skip to main content

Highways England offers public an insight into roadworks operations

Highways England is offering members of the public an opportunity to see how roads and structures are built and maintained at five construction sites as part of the Open Doors initiative, from the 19-24 March. The project aims to inspire young people considering career ideas and adults thinking about a change of occupation to learn more about the range of skills and professionals needed on site. Three sites for the A14 Cambridge to Huntingdon road scheme in Swavesey, Brampton and Ermine Street will
March 15, 2018 Read time: 2 mins

8101 Highways England is offering members of the public an opportunity to see how roads and structures are built and maintained at five construction sites as part of the Open Doors initiative, from the 19-24 March. The project aims to inspire young people considering career ideas and adults thinking about a change of occupation to learn more about the range of skills and professionals needed on site.

Three sites for the A14 Cambridge to Huntingdon road scheme in Swavesey, Brampton and Ermine Street will provide a project talk, guided bus site tour and a question and answer session.
 
The M5 Oldbury Viaduct will feature a project talk and an above and below tour for visitors to see work being carried out.

In addition, the M2 Stockbury Viaduct will host a welcome talk and video as well as an opportunity to climb up scaffolding using staircases to see where the bridge is being lifted.

Mike Wilson, chief highways engineer and director of safety, engineering and standards, said: “Our roads connect the country with around 4 million journeys on them each day. With a record level of investment in roads now is an exciting time for us to show, as part of Open Doors, the hard work that goes on behind the roadworks.

“We want to inspire future generations to join Highways England and as well as organising our own activities in support of the Government’s 2018 Year of Engineering campaign, this is an ideal opportunity for young people, parents and teachers to come to our construction sites and take a closer look at what we do.”

More information is available %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external here Opendoors website link false http://opendoors.construction/ false false%>.

For more information on companies in this article

Related Content

  • Intertraffic Amsterdam 2018 launches start-up event
    August 15, 2017
    Intertraffic is to offer will traffic technology and smart mobility start-ups their own exposure platform. The launch of the ITSUP event during Intertraffic Amsterdam 2018 will provide the opportunity to engage with a large quality audience of traffic technology professionals and to pitch innovative solutions. The ITSUP event will be staged in a dedicated hall, next to the new Smart Mobility hall, with open stages available for presentations as well as a networking area in the centre of the hall facilit
  • How does France’s HGV eco-tax suspension affect RUC professionals?
    November 14, 2013
    Following violent protests from HGV drivers in France, the country's planned introduction of their distance-based eco-tax scheme has now been suspended. French Finance Minister Pierre Moscovici has announced plans to renegotiate the contract concluded with Italian-led consortium Ecomouv, charged with implementing the country's controversial heavy goods vehicle (HGV) eco-tax, to minimise the cost of the levy for taxpayers in France. He emphasised that although the HGV tax has indeed been suspended in the
  • Fluor to upgrade Red and Purple rail lines in Chicago
    December 20, 2018
    A joint venture team of Fluor and Walsh Construction has been chosen as the preferred partner for phase one of the Red and Purple Line modernisation programme in Chicago. The Chicago Transit Authority is behind the $2.1 billion project, which is expected to improve infrastructure across both lines. The scope of the contract includes the development of new elevated tracks along a 1.9-mile section – featuring new bridges, support structures and existing tracks. Also, 3.2 miles of the signal system will be
  • Green Center does away with the parking ticket
    March 19, 2018
    Green Center’s latest solution has replaced the parking ticket with a licence plate number, all done by extending the GPP LPR camera system. The GPP PGS2 parking guidance system is used for guiding drivers when seeking vacant parking spaces in high-capacity areas, such as shopping centres, according to the Czech company. Payment is processed by an automatic pay station by simply entering the licence plate number. With no need for identification of or by the parking ticket, the process is speeded up for