Skip to main content

Highways England announces funding to improve major motorway junction

Highways England has announced plans to invest total of US$3.7 million (£3 million) for major improvements to Switch Island in Merseyside, one of the north-west’s busiest motorway junctions where the M57, M58 and three A roads connect. Construction work at the junction, which is used by over 90,000 vehicles every day, is expected to start next year. The scheme is designed to improve the flow of traffic and enhance safety, following 49 collisions at the junction in the past two years. New traffic light
April 7, 2017 Read time: 2 mins
8101 Highways England has announced plans to invest total of US$3.7 million (£3 million) for major improvements to Switch Island in Merseyside, one of the north-west’s busiest motorway junctions where the M57, M58 and three A roads connect.

Construction work at the junction, which is used by over 90,000 vehicles every day, is expected to start next year. The scheme is designed to improve the flow of traffic and enhance safety, following 49 collisions at the junction in the past two years.

New traffic lights will be installed at a height of over 5 metres – higher than HGVs and double-decker buses – so that drivers approaching the junction can clearly see when the lights are changing.
 
Other improvements will include changes to the road layout and lane markings, new barriers between carriageways, coloured high friction surfaces and better signs.

The scheme is being funded by the government’s US$274 million (£220 million) congestion relief programme, which was announced by Transport Secretary Chris Grayling last month.

Related Content

  • January 31, 2022
    USDoT embraces Vision Zero
    'We cannot tolerate the continuing crisis of roadway deaths,' says transport sec Pete Buttigieg
  • May 26, 2016
    Viaduct deck renewal creates detour dilemma for MassDOT
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab
  • March 30, 2021
    SRL’s temporary permanent traffic solution
    The lengthy reconfiguration of a London accident hotspot to make it safer risked creating its own safety problems. SRL’s John Cleary tells Adam Hill how his firm has been protecting VRUs
  • November 13, 2012
    Traffic to flow freely over world’s widest bridge
    Pete Goldin reports on a new Egis project in Canada, providing open road tolling operations for the widest bridge in the world. A bridge can present a bottleneck in a system of roads or it can support the smooth and unobstructed flow of traffic. Much depends on the bridge design, surrounding infrastructure and tolling system. By adding lanes and deploying open road tolling (ORT), the new Port Mann Bridge located in the metropolitan Vancouver area in British Columbia, will alleviate congestion at one of the