Skip to main content

Highways England announces funding to improve major motorway junction

Highways England has announced plans to invest total of US$3.7 million (£3 million) for major improvements to Switch Island in Merseyside, one of the north-west’s busiest motorway junctions where the M57, M58 and three A roads connect. Construction work at the junction, which is used by over 90,000 vehicles every day, is expected to start next year. The scheme is designed to improve the flow of traffic and enhance safety, following 49 collisions at the junction in the past two years. New traffic light
April 7, 2017 Read time: 2 mins
8101 Highways England has announced plans to invest total of US$3.7 million (£3 million) for major improvements to Switch Island in Merseyside, one of the north-west’s busiest motorway junctions where the M57, M58 and three A roads connect.

Construction work at the junction, which is used by over 90,000 vehicles every day, is expected to start next year. The scheme is designed to improve the flow of traffic and enhance safety, following 49 collisions at the junction in the past two years.

New traffic lights will be installed at a height of over 5 metres – higher than HGVs and double-decker buses – so that drivers approaching the junction can clearly see when the lights are changing.
 
Other improvements will include changes to the road layout and lane markings, new barriers between carriageways, coloured high friction surfaces and better signs.

The scheme is being funded by the government’s US$274 million (£220 million) congestion relief programme, which was announced by Transport Secretary Chris Grayling last month.

For more information on companies in this article

Related Content

  • Data exploits parking potential
    March 11, 2015
    David Crawford parallel parks with innovations in two continents. Surveys of US cities indicate that drivers searching for parking can account for up to 37% of all urban traffic congestion. A 2011 study by IBM of 20 cities around the world found that nearly six out of ten drivers had abandoned their search for a parking space at least once; while motorists generally spent on average 20 minutes looking for a sought-after spot.
  • Netherlands road pricing trial results released
    February 2, 2012
    NXP Semiconductors and IBM have announced the final results of a landmark road pricing trial conducted in the Netherlands, which demonstrated that with the help of technology, drivers can be motivated to change their driving behaviour, reducing traffic congestion and contributing to a greener environment.
  • High-res traffic data provides planners with the big picture
    November 5, 2015
    Road authorities have a lot to gain from high-resolution traffic data, argues Pravin Varaiya. Traffic engineers have traditionally been forced to operate with limited data regarding the performance of their arterials. Traffic studies are often commissioned once every three years, over a few days, to get an updated estimate of utilization.
  • Major traffic signal upgrade underway in Greater Manchester
    March 21, 2016
    A nine-month programme to upgrade traditional wait indicator lamps with longer-lasting and energy-saving LED lights across more than 500 traffic signal sites is underway in Manchester, UK. As part of a contract awarded to Siemens by Transport for Greater Manchester (TfGM), wait indicators will be upgraded at pedestrian crossings and junctions throughout all ten districts of Greater Manchester. This follows the successful completion of a major traffic signalling upgrade programme by Siemens in 2014, with the