Skip to main content

Highways Agency plans to increase capacity of M4

The UK Highways Agency is holding a series of public exhibitions to inform road users, local residents and businesses about proposals to transform the M4 into one of the longest stretches of ‘smart motorway’ in England by 2021. The improvement, on a 32-mile stretch between junction 3 at Hayes in London, and junction 12 at Theale in Berkshire, would increase capacity, improve journey reliability and maintain safety. The proposals are part of the Government’s investment into England’s motorways and majo
March 19, 2014 Read time: 2 mins
The 1841 UK Highways Agency is holding a series of public exhibitions to inform road users, local residents and businesses about proposals to transform the M4 into one of the longest stretches of ‘smart motorway’ in England by 2021.

The improvement, on a 32-mile stretch between junction 3 at Hayes in London, and junction 12 at Theale in Berkshire, would increase capacity, improve journey reliability and maintain safety.

The proposals are part of the Government’s investment into England’s motorways and major A-roads, which will see up to US$6.7 billion a year pumped into improving the roads by 2021, underpinning economic growth and high quality jobs across the region.

As part of the proposals, there would be 64 miles of new traffic lane taken from the existing hard shoulder, increasing capacity.   The initial scheme design also includes 131 new gantries, with 32 existing gantries remaining, while eleven bridges would be rebuilt to provide space for the additional traffic lane and provide safe journeys over the M4 for decades to come. In addition, 32 refuge bays are proposed alongside the carriageway for use by drivers in an emergency.

Subject to gaining consent, construction would be carefully planned to be carried out in phases from 2016.

Lynne Stinson, Highways Agency project manager said: “The M4 is an important corridor in and out of London for those who live and work in Buckinghamshire and Berkshire, as well as those further afield in the South West and Wales, with around 130,000 vehicles using this stretch every day.

“Based on proven benefits elsewhere, we have produced outline proposals that would see 32 miles of the M4 transformed into a ‘smart motorway’; we’re planning extra capacity by converting the hard shoulder into an additional traffic lane and introducing variable mandatory speed limits displayed overhead to help smooth the flow of traffic and reduce congestion, and to provide traffic information, with safety bays in place to maintain safety.”

For more information on companies in this article

Related Content

  • $268m FTA grant for San Antonio rapid transit
    January 3, 2025
    Via Rapid Green Line is planned to be up and running by late 2027
  • CBI calls for new approach to road funding
    October 11, 2012
    The Confederation of British Industry (CBI) calls for road charging should be introduced on the strategic road network in England. Proposals in the report, Bold Thinking: A model to fund our future roads also suggest that responsibility for the network’s budget should be taken away from the Department for Transport (DfT) and given to an independent regulator. Launching the report, CBI director-general John Cridland said a regulatory asset base (RAB) model was required to address the problem of long-term fu
  • Smart Cities put people, prudence and businesses before technology
    December 4, 2014
    Caroline Haynes tells ITS International that transport planners and equipment suppliers need to adopt different thinking and the smartest cities don’t call themselves smart. The term Smart Cities has been around for some time and has become something of a catch-all term applied to novel or futuristic technology deployed in an urban setting.
  • Fitch Ratings analysis indicates problems for toll express lanes
    November 12, 2013
    A special report, US Managed Lanes, by Fitch Ratings sees toll express or managed lanes (MLs) as especially difficult to assess for financial viability, saying that they vary enormously one to another and are likely to demonstrate very different performance and be subject to greater volatility than regular toll roads. But they say there is now sufficient experience with managed lanes (MLs) for some lessons to be learned. ML time savings compared to the regular lanes has been seen as the fundamental drive