Skip to main content

Highways Agency plans to increase capacity of M4

The UK Highways Agency is holding a series of public exhibitions to inform road users, local residents and businesses about proposals to transform the M4 into one of the longest stretches of ‘smart motorway’ in England by 2021. The improvement, on a 32-mile stretch between junction 3 at Hayes in London, and junction 12 at Theale in Berkshire, would increase capacity, improve journey reliability and maintain safety. The proposals are part of the Government’s investment into England’s motorways and majo
March 19, 2014 Read time: 2 mins
The 1841 UK Highways Agency is holding a series of public exhibitions to inform road users, local residents and businesses about proposals to transform the M4 into one of the longest stretches of ‘smart motorway’ in England by 2021.

The improvement, on a 32-mile stretch between junction 3 at Hayes in London, and junction 12 at Theale in Berkshire, would increase capacity, improve journey reliability and maintain safety.

The proposals are part of the Government’s investment into England’s motorways and major A-roads, which will see up to US$6.7 billion a year pumped into improving the roads by 2021, underpinning economic growth and high quality jobs across the region.

As part of the proposals, there would be 64 miles of new traffic lane taken from the existing hard shoulder, increasing capacity.   The initial scheme design also includes 131 new gantries, with 32 existing gantries remaining, while eleven bridges would be rebuilt to provide space for the additional traffic lane and provide safe journeys over the M4 for decades to come. In addition, 32 refuge bays are proposed alongside the carriageway for use by drivers in an emergency.

Subject to gaining consent, construction would be carefully planned to be carried out in phases from 2016.

Lynne Stinson, Highways Agency project manager said: “The M4 is an important corridor in and out of London for those who live and work in Buckinghamshire and Berkshire, as well as those further afield in the South West and Wales, with around 130,000 vehicles using this stretch every day.

“Based on proven benefits elsewhere, we have produced outline proposals that would see 32 miles of the M4 transformed into a ‘smart motorway’; we’re planning extra capacity by converting the hard shoulder into an additional traffic lane and introducing variable mandatory speed limits displayed overhead to help smooth the flow of traffic and reduce congestion, and to provide traffic information, with safety bays in place to maintain safety.”

Related Content

  • July 17, 2017
    UK motorway gets first ‘orange’ smart motorway emergency area
    The first new-style smart motorway emergency area, where drivers can stop in an emergency, is being trialled on the M3 motorway in Surrey. Highways England is trialling the redesigned emergency area in response to public concern about smart motorways. It has a highly visible orange road surface and better signs to help improve its visibility make it more obvious to drivers on smart motorways. It is also hoped that it will encourage drivers to only use them in emergency situations. The first of the new emerg
  • December 10, 2014
    FTA says Highways Agency new name reflects importance of role
    A government announcement has revealed that the UK’s Highways Agency will be replaced with Highways England and will be a government-owned company from April 2015. In support of the changes, the Freight Transport Association (FTA) has said that “the new name reflects the importance of its new role.” In its first strategic business plan, Highways England sets out how the new body will deliver the Government’s US$23.5 billion road investment programme over the next five years. The plan envisages spend
  • December 5, 2018
    England’s first motorway celebrates 60th birthday with ITS upgrade
    Sixty years today, 2,300 drivers drove along an eight-mile section of road in England – the first motorway in the country. Opened in 1958, the Preston bypass – now part of the M6 - only had two lanes in each direction, with no safety barrier in the central reservation. There was also no technology – not even simple electronic signs. Highways England is pledging to celebrate the birthday by completing four upgrades on the M6 by spring 2022. The £900m project will add extra lanes and better technolog
  • June 12, 2015
    Temporary CCTV poses more challenges than permanent installations
    Long-term roadworks pose particular problems for temporary surveillance installations. Converting the hard shoulder to a running lane, either full- or part-time, is the UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.