Skip to main content

Highways Agency plans to increase capacity of M4

The UK Highways Agency is holding a series of public exhibitions to inform road users, local residents and businesses about proposals to transform the M4 into one of the longest stretches of ‘smart motorway’ in England by 2021. The improvement, on a 32-mile stretch between junction 3 at Hayes in London, and junction 12 at Theale in Berkshire, would increase capacity, improve journey reliability and maintain safety. The proposals are part of the Government’s investment into England’s motorways and majo
March 19, 2014 Read time: 2 mins
The 1841 UK Highways Agency is holding a series of public exhibitions to inform road users, local residents and businesses about proposals to transform the M4 into one of the longest stretches of ‘smart motorway’ in England by 2021.

The improvement, on a 32-mile stretch between junction 3 at Hayes in London, and junction 12 at Theale in Berkshire, would increase capacity, improve journey reliability and maintain safety.

The proposals are part of the Government’s investment into England’s motorways and major A-roads, which will see up to US$6.7 billion a year pumped into improving the roads by 2021, underpinning economic growth and high quality jobs across the region.

As part of the proposals, there would be 64 miles of new traffic lane taken from the existing hard shoulder, increasing capacity.   The initial scheme design also includes 131 new gantries, with 32 existing gantries remaining, while eleven bridges would be rebuilt to provide space for the additional traffic lane and provide safe journeys over the M4 for decades to come. In addition, 32 refuge bays are proposed alongside the carriageway for use by drivers in an emergency.

Subject to gaining consent, construction would be carefully planned to be carried out in phases from 2016.

Lynne Stinson, Highways Agency project manager said: “The M4 is an important corridor in and out of London for those who live and work in Buckinghamshire and Berkshire, as well as those further afield in the South West and Wales, with around 130,000 vehicles using this stretch every day.

“Based on proven benefits elsewhere, we have produced outline proposals that would see 32 miles of the M4 transformed into a ‘smart motorway’; we’re planning extra capacity by converting the hard shoulder into an additional traffic lane and introducing variable mandatory speed limits displayed overhead to help smooth the flow of traffic and reduce congestion, and to provide traffic information, with safety bays in place to maintain safety.”

For more information on companies in this article

Related Content

  • Tri-nation cooperation on C-ITS Corridor
    June 20, 2016
    In the European C-ITS Corridor project, authorities from three countries are working with the automotive industry on the deployment of Cooperative (V2X) Systems. Cooperative Intelligent Transport Systems/Services (C-ITS) has the potential to improve road safety, transport efficiency and environmentally friendly mobility, as well as creating additional services and new business models. A set of international standards have been developed to provide the technical basis for the deployment of Cooperative ITS.
  • Balfour Beatty JV awarded Southern Gateway contract by Texas DOT
    May 5, 2017
    Pegasus Link Constructors, a joint venture comprising infrastructure group Balfour Beatty and Fluor Corporation, has been awarded a US$625 million (£484 million) contract to reconstruct and improve the Southern Gateway, an 11 mile stretch of road in Dallas, Texas. The Texas Department of Transportation awarded the contract as part of the Clear Lanes initiative, a programme that prioritises funding for congestion relief projects in Texas’ metropolitan areas. The improvement scheme will improve road-user saf
  • Government blitz on “disruptive roadworks” causing traffic jams in UK
    January 17, 2024
    Consultation may increase fines for companies whose street works overrun
  • Variable message signs continue to deliver travel information
    February 2, 2012
    Arguably the 'face' of ITS, variable message signs are far from being a passing solution