Skip to main content

Highway upgrade features Australian first intersection design

A new interchange design to improve traffic management will be a key part of a major Queensland, Australia road project, with the contract awarded today for a US$712 million (AU$929.3 million) upgrade to the Bruce Highway between Caloundra Road and the Sunshine Motorway. Minister for Infrastructure and Transport Darren Chester and Queensland Main Roads Minister Mark Bailey today announced a Fulton Hogan Seymour Whyte joint venture had won the contract for the project, which aims to ultimately reduce cong
September 22, 2016 Read time: 2 mins
A new interchange design to improve traffic management will be a key part of a major Queensland, Australia road project, with the contract awarded today for a US$712 million (AU$929.3 million) upgrade to the Bruce Highway between Caloundra Road and the Sunshine Motorway.

Minister for Infrastructure and Transport Darren Chester and Queensland Main Roads Minister Mark Bailey today announced a Fulton Hogan Seymour Whyte joint venture had won the contract for the project, which aims to ultimately reduce congestion and travel time for motorists.

The project involves widening the highway to six lanes, as well a major upgrade to the Sunshine Motorway interchange and reconfiguring the Caloundra Road interchange to a diverging diamond interchange, in which the two directions of traffic on the non-freeway road cross to the opposite side on both sides of the bridge at the freeway. This is a first for Australia and could be used in future projects across the country, according to Darren Chester.

Chester said this intersection zone sees the most crashes on the Bruce Highway and it urgently needs a new approach to traffic management for the roughly 60,000 vehicles that use it every day.

Preliminary construction is anticipated to start by the end of 2016, with major construction expected to start in mid-2017 and be completed in 2020, weather permitting.

Related Content

  • Mobility pricing offers new tools for managing mobility
    November 23, 2017
    Mobility pricing is the best way of sustaining and enhancing mobility, argues Moving Forward Consulting’s Josef Czako. Mobility pricing (MP) is effectively the culmination of the ‘user pays’ principle and has been referred to in many policy discussions about electronic toll collection, road user charging (RUC), and pricing. MP not only reflects the ‘use more, pay more’ nature of RUC, it also takes account of the external cost of journeys including pollution, noise, the cost of congestion and accidents.
  • Contracts awarded for London’s traffic signals upgrade
    July 18, 2014
    Transport for London (TfL) has awarded new traffic signals maintenance contracts, worth around US$542 million for up to eight years, which will see the capital’s 6,000 traffic signals upgraded and maintained to the latest, greenest standards. Awarded to Telent Technology Services for west and south-west London, Siemens for north and north-west London and Cubic Transportation Systems for south-east London, the new Traffic Control Management Services contracts will help expand the use of intelligent traf
  • STV selected to design Massachusetts rail extension
    May 10, 2018
    Transport design firm STV has been chosen as lead designer for the Massachusetts Bay Transportation Authority’s (MBTA’s) $1.3bn Green Line Light Rail Extension (GLX). MBTA expects the 4.3 mile expanded route to reduce up to 26,000 regional daily vehicle miles travelled, improving air quality and reducing congestion. Once completed, the increased line will provide commuters in Cambridge, Somerville and Medford with journeys to downtown Boston. Construction is expected to begin later this year, with the se
  • Study finds rumble strips save lives on rural highways
    June 2, 2015
    A recently completed study shows that rumble strips are proving to be an effective and low-cost way to reduce crashes on Michigan's state highways. The Michigan Department of Transportation (MDOT) started a major rumble strip program for two-lane high-speed rural highways in 2008. Centre-line and shoulder rumble strips were installed on all MDOT rural, non-freeway highways with posted speed limits of 55 mph and appropriate paved lane and shoulder widths. To date, 5,700 miles of centre-line rumble strips