Skip to main content

Highway upgrade features Australian first intersection design

A new interchange design to improve traffic management will be a key part of a major Queensland, Australia road project, with the contract awarded today for a US$712 million (AU$929.3 million) upgrade to the Bruce Highway between Caloundra Road and the Sunshine Motorway. Minister for Infrastructure and Transport Darren Chester and Queensland Main Roads Minister Mark Bailey today announced a Fulton Hogan Seymour Whyte joint venture had won the contract for the project, which aims to ultimately reduce cong
September 22, 2016 Read time: 2 mins
A new interchange design to improve traffic management will be a key part of a major Queensland, Australia road project, with the contract awarded today for a US$712 million (AU$929.3 million) upgrade to the Bruce Highway between Caloundra Road and the Sunshine Motorway.

Minister for Infrastructure and Transport Darren Chester and Queensland Main Roads Minister Mark Bailey today announced a Fulton Hogan Seymour Whyte joint venture had won the contract for the project, which aims to ultimately reduce congestion and travel time for motorists.

The project involves widening the highway to six lanes, as well a major upgrade to the Sunshine Motorway interchange and reconfiguring the Caloundra Road interchange to a diverging diamond interchange, in which the two directions of traffic on the non-freeway road cross to the opposite side on both sides of the bridge at the freeway. This is a first for Australia and could be used in future projects across the country, according to Darren Chester.

Chester said this intersection zone sees the most crashes on the Bruce Highway and it urgently needs a new approach to traffic management for the roughly 60,000 vehicles that use it every day.

Preliminary construction is anticipated to start by the end of 2016, with major construction expected to start in mid-2017 and be completed in 2020, weather permitting.
UTC

Related Content

  • September 4, 2018
    ITS instrumental in reducing Texan congestion
    ITS projects in the Houston area have seen costs crunched – and even a system failure has proved valuable in analysing performance. David Crawford reports on developments in the Lone Star state Savings by Texan public agencies are major factors in the recent ITS Texas awards, recognising beneficial initiatives in bridge strike prevention and traffic intersection control. In the first, the Texas Department of Transportation (TxDOT)’s Houston District, covering the state’s most populous city and its surround
  • February 1, 2012
    No in-road equipment for Queensland's free flow toll bridge
    By May this year, the new Gateway Bridge in Brisbane, which is being built alongside an existing bridge, will be open. With it will come an end-to-end free-flow tolling system. Interview with Sue Caelers, Queensland Motorway Ltd. Queensland Motorways Ltd owns and operates 61km of roadway in the area around Brisbane, Australia. This includes the Gateway Bridge and the Gateway Extension, Logan and Port of Brisbane motorways.
  • June 17, 2016
    Joining old and new in Canada’s Highway 407
    David Arminas visits Canada’s Highway 407 ETR to see how the concession is working and hear about new arrangements for the roadway’s extension. The Toronto region is North America’s eighth largest metropolitan area and its roads become notoriously congested. In 1997 Highway 407, a 68km concrete toll motorway which skirts the northern edge of Toronto, was opened and initially operated by the province and CHIC - a consortium of four leading Ontario-based companies. Finance came from the Ontario Financing Auth
  • April 8, 2014
    UK defaults to hard shoulder running to expand motorway capacity
    Hard shoulder running has become the UK’s default response to increasing motorway capacity as Colin Sowman reports. Facing a predicted 46% increase in traffic levels by 2040 and the current economic recovery leading to more people travelling to, from and for work leaves the UK government under short- and long-term pressure to increase the capacity on the main motorway network. Particular sections of motorways are already experiencing repeated, sometimes tidal, congestion and both tight Treasury limits and t