Skip to main content

Highway upgrade features Australian first intersection design

A new interchange design to improve traffic management will be a key part of a major Queensland, Australia road project, with the contract awarded today for a US$712 million (AU$929.3 million) upgrade to the Bruce Highway between Caloundra Road and the Sunshine Motorway. Minister for Infrastructure and Transport Darren Chester and Queensland Main Roads Minister Mark Bailey today announced a Fulton Hogan Seymour Whyte joint venture had won the contract for the project, which aims to ultimately reduce cong
September 22, 2016 Read time: 2 mins
A new interchange design to improve traffic management will be a key part of a major Queensland, Australia road project, with the contract awarded today for a US$712 million (AU$929.3 million) upgrade to the Bruce Highway between Caloundra Road and the Sunshine Motorway.

Minister for Infrastructure and Transport Darren Chester and Queensland Main Roads Minister Mark Bailey today announced a Fulton Hogan Seymour Whyte joint venture had won the contract for the project, which aims to ultimately reduce congestion and travel time for motorists.

The project involves widening the highway to six lanes, as well a major upgrade to the Sunshine Motorway interchange and reconfiguring the Caloundra Road interchange to a diverging diamond interchange, in which the two directions of traffic on the non-freeway road cross to the opposite side on both sides of the bridge at the freeway. This is a first for Australia and could be used in future projects across the country, according to Darren Chester.

Chester said this intersection zone sees the most crashes on the Bruce Highway and it urgently needs a new approach to traffic management for the roughly 60,000 vehicles that use it every day.

Preliminary construction is anticipated to start by the end of 2016, with major construction expected to start in mid-2017 and be completed in 2020, weather permitting.
UTC

Related Content

  • January 27, 2012
    Ramp metering delivers - again
    Though still controversial, ramp metering, which has been around for nearly 50 years, continues to deliver substantial benefits, and generally for relatively small cost. Kansas City is a case in point. In March 2010, Kansas City Scout, a partnership between the Missouri and Kansas Departments of Transportation to provide ITS for the greater Kansas City Area, activated the first ramp metering system in the region. The project is located on an 8.85km (5.5 mile) section of Interstate 435 from Metcalf Avenue to
  • November 18, 2014
    ITS needs data highways
    Transport and traffic data is on the increase but there must be an integrated data highway to derive the maximum ITS benefits, argues Deutsche Telekom. From public transport operators recording increasingly precise and comprehensive data on their vehicle’s position and driving behaviour to local authorities using RFID and video systems to control traffic on their streets and highways, the amount of traffic data is growing rapidly.
  • April 24, 2014
    FDOT to award Florida I-4 Ultimate project
    The Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today. The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total d
  • January 25, 2022
    Data helps Ohio DoT get grant money
    Ohio Department of Transportation turned to StreetLight Data when it needed to finalise grant money for a key infrastructure link. David Crawford sees how metrics brought in the cash…