Skip to main content

Highway upgrade features Australian first intersection design

A new interchange design to improve traffic management will be a key part of a major Queensland, Australia road project, with the contract awarded today for a US$712 million (AU$929.3 million) upgrade to the Bruce Highway between Caloundra Road and the Sunshine Motorway. Minister for Infrastructure and Transport Darren Chester and Queensland Main Roads Minister Mark Bailey today announced a Fulton Hogan Seymour Whyte joint venture had won the contract for the project, which aims to ultimately reduce cong
September 22, 2016 Read time: 2 mins
A new interchange design to improve traffic management will be a key part of a major Queensland, Australia road project, with the contract awarded today for a US$712 million (AU$929.3 million) upgrade to the Bruce Highway between Caloundra Road and the Sunshine Motorway.

Minister for Infrastructure and Transport Darren Chester and Queensland Main Roads Minister Mark Bailey today announced a Fulton Hogan Seymour Whyte joint venture had won the contract for the project, which aims to ultimately reduce congestion and travel time for motorists.

The project involves widening the highway to six lanes, as well a major upgrade to the Sunshine Motorway interchange and reconfiguring the Caloundra Road interchange to a diverging diamond interchange, in which the two directions of traffic on the non-freeway road cross to the opposite side on both sides of the bridge at the freeway. This is a first for Australia and could be used in future projects across the country, according to Darren Chester.

Chester said this intersection zone sees the most crashes on the Bruce Highway and it urgently needs a new approach to traffic management for the roughly 60,000 vehicles that use it every day.

Preliminary construction is anticipated to start by the end of 2016, with major construction expected to start in mid-2017 and be completed in 2020, weather permitting.
UTC

Related Content

  • November 13, 2014
    Colombian highway sees ITS tested to the extreme
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • November 13, 2012
    Traffic to flow freely over world’s widest bridge
    Pete Goldin reports on a new Egis project in Canada, providing open road tolling operations for the widest bridge in the world. A bridge can present a bottleneck in a system of roads or it can support the smooth and unobstructed flow of traffic. Much depends on the bridge design, surrounding infrastructure and tolling system. By adding lanes and deploying open road tolling (ORT), the new Port Mann Bridge located in the metropolitan Vancouver area in British Columbia, will alleviate congestion at one of the
  • November 8, 2013
    'Smart' motorways on their way to Greater Manchester
    Details of a multi-million pound project have been unveiled that will cut congestion and improve journey times on parts of the M60 and M62 in Greater Manchester. The smart motorways scheme – the first of its kind in the north-west – will be introduced on a 17-mile stretch of the network between junction 8 of the M60 near Sale and junction 20 of the M62 near Rochdale. The system will use the latest technology to monitor traffic levels, provide traffic information to road users, and ease congestion by usin
  • July 8, 2019
    Cost benefit: Wichita eases workzone congestion
    Achieving higher diversion rates has helped one Kansas city to make traffic flow more efficient around workzones. David Crawford examines what’s behind a 10:1 benefit-to-cost ratio in Wichita Around 10% of highway congestion in the US results from delays in workzones, leading to an estimated annual loss of $700 million in fuel costs alone. The lack of accessible real-time traffic information to help motorists minimise their inconvenience – particularly at peak times - is a major contributor. One solut