Skip to main content

HGV speed limit pilot given the seal of approval

The legislation to allow heavy goods vehicles (HGVs) to travel at 50mph on sections of single carriageway on the A9 between Perth and Inverness in Scotland has been signed and will come into force at the same time as the average speed camera system on the route becomes operational – 28 October. The pilot, which was approved by the Scottish Parliament earlier this year, will help to improve journey times and also driver behaviour, by reducing frustration, queue lengths and journey times for HGVs. Trans
October 22, 2014 Read time: 3 mins
The legislation to allow heavy goods vehicles (HGVs) to travel at 50mph on sections of single carriageway on the A9 between Perth and Inverness in Scotland has been signed and will come into force at the same time as the average speed camera system on the route becomes operational – 28 October.

The pilot, which was approved by the Scottish Parliament earlier this year, will help to improve journey times and also driver behaviour, by reducing frustration, queue lengths and journey times for HGVs.

Transport minister Keith Brown said: “This pilot is part of a package of measures that is being taken forward to improve the operational performance of the A9 and to enhance safety.

“We want to see reliable and competitive journey times for all road users, including the freight haulage industry. Simply raising the speed limits for HGVs could have a detrimental effect, but the use of average speed cameras as part of the pilot helps support the wider changes we are making to promote an overall improvement in driving conditions.

“The 50 mph HGV pilot will bring operational benefits and help reduce frustration on Scotland’s longest road.”

Richard Burnett, chief executive of the 6985 Road Haulage Association said: “The key issue here is one of improving journey time reliability for hauliers and other road users alike. Many A9 incidents, together with the resultant delays, are caused by no more than sheer motorist frustration when getting stuck behind a slow moving heavy goods vehicle. It makes sense that a 10mph reduction in the speed differential between cars and HGV’s will mean a corresponding reduction in frustration and accidents.

“In addition to improved efficiency, as most modern trucks do not get into top gear at 40mph, there are potential safety benefits. This really is a win-win situation for all users of one Scotland’s major arterial routes.”

Malcolm Bingham, the 6983 Freight Transport Association’s head of Road Network Management Policy, said: “FTA is in full support of the 50mph speed limit trial for HGVs on the A9 and we look forward to its introduction on 28 October. We welcome the opportunity for such a trial as we believe the current differential in speed limits between HGVs and other vehicles increases the road safety risk."

For more information on companies in this article

Related Content

  • Spotlight on possible changes to the European eco-tax
    January 31, 2014
    Following the suspension of the eco-tax on heavy vehicles in October 2013, a number of possible changes are being studied which could lead to its eventual implementation. The tax is expected to generate some US$1.63 billion per year, which would be used to finance the construction of railways and canals in order to reduce haulage activity on the road. Possible changes include re-naming the tax, increasing the current 3.5 tonnes minimum vehicle weight, increasing the number of regions which benefit from a
  • Autonomous driving – what can we really expect?
    June 6, 2016
    Dave Marples of Technolution BV looks beyond the hype to the practical implementation of autonomous vehicles. Having looked at the development of this sector for some time, I am concerned about the current state of autonomous driving development as engineering (and marketing) have run way ahead of the wider systemic, and legislative, requirements to support an autonomous future.
  • Scotland pledges 'no road deaths by 2050'
    March 5, 2021
    Scottish Government's Road Safety Framework unveils interim safety targets to 2030
  • 'Smart' motorways on their way to Greater Manchester
    November 8, 2013
    Details of a multi-million pound project have been unveiled that will cut congestion and improve journey times on parts of the M60 and M62 in Greater Manchester. The smart motorways scheme – the first of its kind in the north-west – will be introduced on a 17-mile stretch of the network between junction 8 of the M60 near Sale and junction 20 of the M62 near Rochdale. The system will use the latest technology to monitor traffic levels, provide traffic information to road users, and ease congestion by usin