Skip to main content

Greenlots and Volvo Trucks to install EV chargers in California

Technology company Greenlots has partnered with Volvo Trucks to implement an electric vehicle (EV) charging infrastructure for fleets operating out of warehouses in southern California. The project is part of a public-private partnership, in which the California Air Resources Board (CARB) awarded $44.8 million to the South Coast Air Quality Management District. The funded was used for Volvo’s Low Impact Green Heavy Transport Solutions (LIGHTS) project. As part of LIGHTS, Greenlots will equip warehouses
November 15, 2018 Read time: 2 mins

Technology company Greenlots has partnered with 5874 Volvo Trucks to implement an electric vehicle (EV) charging infrastructure for fleets operating out of warehouses in southern California. 

The project is part of a public-private partnership, in which the California Air Resources Board (CARB) awarded $44.8 million to the South Coast Air Quality Management District. The funded was used for 609 Volvo’s Low Impact Green Heavy Transport Solutions (LIGHTS) project. 

As part of LIGHTS, Greenlots will equip warehouses with heavy- and light-duty charging infrastructure, integrate the chargers with onsite solar photovoltaic and energy storage systems and utilise charging management software to deploy the Volvo electrified trucks. 

LIGHTS is part of California’s Climate Investments – a statewide initiative that seeks to reduce greenhouse gas emissions and improve the environment. 

All charging equipment, which includes Level 2 chargers and 150kW DC fast-chargers, will operate on Greenlot’s Sky enterprise software platform to manage the fleet, charging stations and energy storage systems. 

Brett Hauser, CEO of Greenlots, believes there are benefits of electrifying medium- and heavy-duty fleets, but there are also challenge associated with power requirements.  

"Our solution offers fleet owners the lowest total cost of ownership by managing energy usage to prevent high utility bills and supplying grid operators with the tools needed to safely integrate EVs and renewables into the grid,” Hauser adds.

Greenlots will work with 4540 ABB and other charging station manufacturers to provide the equipment. The company has also partnered with engineering firm Burns & McDonnell to install the charging stations. 

For more information on companies in this article

Related Content

  • Study highlights regressive effects of road pricing and tolling
    April 9, 2014
    Road pricing can have a detrimental effect on the mobility and employment levels of low income households. Colin Sowman talks to Floridea Di Ciommo to discover why. Since the road pricing and tolling were first introduced it has been acknowledged that such schemes could have a disproportional impact on low income households but a study in Madrid, Spain, has revealed just how regressive such measures can be. The findings revealed that the consequences of a proposed road pricing scheme would be a 17% increas
  • Connected Kerb in NYC EV project
    August 5, 2022
    UK firm will be part of NYCDoT's DOT Studio initiative to drive up EV ownership
  • New clean diesel cars and light trucks to ‘help US achieve greenhouse gas reductions’
    July 25, 2016
    Advances in emissions control technology in clean diesel passenger cars and light duty pickup trucks will have a positive effect on efforts to reduce future Greenhouse Gas Emissions, according to the federal government’s newly-released Draft Technical Assessment Report (TAR). The Draft TAR, which covers vehicle model years 2022-2025, confirms that automotive manufacturers are introducing new technology to market at a rapid pace, and predicts that the MY 2022-2025 standards are achievable with a wide ran
  • Another section of West Coast Green Highway EV charging infrastructure announced
    April 19, 2012
    The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.