Skip to main content

Green light for traffic signal performance

A revamp of traffic light maintenance is helping to reduce congestion, save money and improve safety on Greater Manchester’s roads, according to the latest figures from Transport for Greater Manchester (TfGM), which is responsible for all 2,400 traffic signals across the region. These show that the number of incidents of traffic signal failure has steadily declined over the past three years. Between July 2015 and April 2016, there was an average of 413 signal fault faults per month. This is 24 per cent
June 24, 2016 Read time: 2 mins
A revamp of traffic light maintenance is helping to reduce congestion, save money and improve safety on Greater Manchester’s roads, according to the latest figures from 817 Transport for Greater Manchester (TfGM), which is responsible for all 2,400 traffic signals across the region.

These show that the number of incidents of traffic signal failure has steadily declined over the past three years. Between July 2015 and April 2016, there was an average of 413 signal fault faults per month. This is 24 per cent lower than the monthly average of 527 recorded between July 2014 and June 2015 and 48 per cent less still than the average of 795 recorded between July 2013 and June 2014.

The improvement comes, primarily, from upgrading the region’s signals with low energy and low maintenance LED ‘aspects’ – the optical unit that displays the signal colour. This project was carried out by TfGM’s traffic signal maintenance contractor, Siemens, and was completed in April 2014.

The aspect replacement project is expected to save US$13.6 million (£9.8 million) over the first ten years by reducing both the need for regular maintenance and energy consumption. The improvement also comes from Siemens working in a more efficient manner, focusing more on pre-emptive maintenance rather than reacting to faults.

TfGM Committee Chair, Councillor Andrew Fender, said: “Traffic signals are a vital part of the region’s highways network, and through them we help to manage 2.1 billion trips on the Greater Manchester road network each year, so it’s excellent news that they are performing almost twice as well as they were three years ago and costing less money to run and maintain.

“We’ll continue to review and, where possible, further improve our signal maintenance procedures to help make sure that there are even fewer traffic light failures in the future.

For more information on companies in this article

Related Content

  • Big data analytics identifies congestion increases
    November 26, 2014
    Iteris has completed and published the Alameda County Transportation Commission (Alameda CTC) 2014 Level of Service Monitoring Report. The report was generated for speed-based congestion monitoring, utilising big data analytics in place of conventional in-field manual data collection for 205 miles of the 327 mile network. Use of big data analytics will be expanded in future monitoring cycles. Many agencies conduct congestion monitoring through manual data collection efforts. Agencies traditionally us
  • San Antonio, Texas, chooses Toshiba LED street lights
    October 1, 2012
    Toshiba International is to replace over 20,000 high-pressure sodium (HPS) street lamps in San Antonio, Texas with LED luminaires. The city’s existing 250-watt HPS luminaires consume 310 system watts and are being replaced by Toshiba’s 100-watt 42-chip TGT LED luminaires. According to Toshiba, product durability and low energy consumption means LED lighting provides one of the lowest life cycle costs of any lighting technology.
  • UK Government fast tracks driverless cars
    July 30, 2014
    UK business secretary Vince Cable has announced two new measures today that give the green light for driverless cars to take to UK roads from January 2015. UK cities can now bid for a share of a US$16.9 million competition to host a driverless cars trial. The government is calling on cities to join together with businesses and research organisations to put forward proposals to become a test location. Up to three cities will be selected to host the trials from 2015 and each project is expected to last
  • Close shave for Brazilian project
    June 12, 2015
    Signing the order to equip a new control room just 45 days before the city hosts a major sporting event is challenging - but some deadlines just cannot be moved. There is nothing like a deadline to concentrate minds and effort as Mitsubishi and the Brazilian city of Belo Horizonte discovered in the run-up to the 2014 World Cup. Although municipal authorities had been considering a new command centre for years, it was the hosting of the World Cup last summer that provided the final impetus.