Skip to main content

Green light for traffic signal performance

A revamp of traffic light maintenance is helping to reduce congestion, save money and improve safety on Greater Manchester’s roads, according to the latest figures from Transport for Greater Manchester (TfGM), which is responsible for all 2,400 traffic signals across the region. These show that the number of incidents of traffic signal failure has steadily declined over the past three years. Between July 2015 and April 2016, there was an average of 413 signal fault faults per month. This is 24 per cent
June 24, 2016 Read time: 2 mins
A revamp of traffic light maintenance is helping to reduce congestion, save money and improve safety on Greater Manchester’s roads, according to the latest figures from 817 Transport for Greater Manchester (TfGM), which is responsible for all 2,400 traffic signals across the region.

These show that the number of incidents of traffic signal failure has steadily declined over the past three years. Between July 2015 and April 2016, there was an average of 413 signal fault faults per month. This is 24 per cent lower than the monthly average of 527 recorded between July 2014 and June 2015 and 48 per cent less still than the average of 795 recorded between July 2013 and June 2014.

The improvement comes, primarily, from upgrading the region’s signals with low energy and low maintenance LED ‘aspects’ – the optical unit that displays the signal colour. This project was carried out by TfGM’s traffic signal maintenance contractor, Siemens, and was completed in April 2014.

The aspect replacement project is expected to save US$13.6 million (£9.8 million) over the first ten years by reducing both the need for regular maintenance and energy consumption. The improvement also comes from Siemens working in a more efficient manner, focusing more on pre-emptive maintenance rather than reacting to faults.

TfGM Committee Chair, Councillor Andrew Fender, said: “Traffic signals are a vital part of the region’s highways network, and through them we help to manage 2.1 billion trips on the Greater Manchester road network each year, so it’s excellent news that they are performing almost twice as well as they were three years ago and costing less money to run and maintain.

“We’ll continue to review and, where possible, further improve our signal maintenance procedures to help make sure that there are even fewer traffic light failures in the future.
UTC

Related Content

  • July 19, 2012
    Kapsch TrafficCom increases turnover
    Kapsch TrafficCom recorded a turnover increase from €388.66 million (US$476.75 million) in the 2010/2011 business year to €549.9 million in the 2011/2012 business year. Net profits decreased three per cent to €27.5 million and Ebit decreased 13.6 per cent to €42.2 million.
  • December 6, 2012
    Debating the future of in-vehicle systems
    Industry experts talk to Jason Barnes about the legislative situation of current and future in-vehicle systems. Articles about technology development can have a tendency to reference Moore’s Law with almost indecent regularity and haste but the fact remains that despite predictions of slow-down or plateauing, the pace remains unrelenting. That juxtaposes with a common tendency within the ITS industry: to concentrate on the technology and assume that much else – legislation, business cases and so on – will m
  • August 2, 2013
    Suppliers reshape to provide tolling and traffic management expertise
    Jason Barnes examines the trend towards single source supply of complete tolling and traffic management solutions with some senior tolling industry figures. Only a few years back, the major tolling system suppliers were aggressively positioning themselves as one-stop shops for tolling solutions and operations. No sooner has that little flurry of innovation settled than another trend has emerged – tolling companies wanting to become major ITS suppliers as well. Various tolling company seniors have in recent
  • January 13, 2015
    Transport for the North gears up
    UK Transport Secretary Patrick McLoughlin attended the inaugural Transport for the North meeting as northern leaders met to discuss their plans to transform the region into a northern powerhouse. The meeting in Leeds heralded the first step of drawing up with the government a comprehensive transport strategy to transform the north’s economic infrastructure and help maximise the region’s growth potential, rebalancing the national economy. As well as examining east-west rail links to better connect the