Skip to main content

Golden River wins TfL contract for wireless vehicle detection system

Transport for London (TfL) has awarded Golden River Traffic a framework contract for the supply of wireless magnetometers for SCOOT deployment and associated services. With an initial contract duration of 12 months and potential to extend for up to a further four years, Golden River, a division of Clearview Traffic Group, will be supplying the M100 Wireless vehicle detection system which is a cost effective alternative to inductive loops and ideally suited to SCOOT and MOVA deployments.
July 31, 2012 Read time: 1 min
1466 Transport for London (TfL) has awarded 2057 Golden River Traffic a framework contract for the supply of wireless magnetometers for SCOOT deployment and associated services. With an initial contract duration of 12 months and potential to extend for up to a further four years, Golden River, a division of 557 Clearview Traffic Group, will be supplying the M100 Wireless vehicle detection system which is a cost effective alternative to inductive loops and ideally suited to SCOOT and MOVA deployments.

Since gaining full UK TR2512A type approval in 2009, the system has earned broad acceptance, with the company rolling out its 150th installation earlier in the year. It is claimed that the M100, which offers over 98 per cent accuracy for vehicle presence and speed, is the only wireless solution that is compatible with all major brands of traffic signal controllers.
UTC

Related Content

  • January 29, 2024
    Pennsylvania and Georgia contract wins for Rekor Systems
    Firm studies vehicle patterns in Philadelphia's Navy Yard and in Metro Atlanta
  • October 29, 2021
    Boom times for SRL
    SRL also offers the lighter weight Instaboom Lite or use on short duration operations,
  • October 14, 2014
    New river crossings vital for east London
    With the capital’s population forecast to grow to 10 million people by 2030, and with much of this growth due to take place in east London, demand for crossing the river will increase. Unless new river crossings are provided in east London, the overall growth of this part of London will be affected and its economic potential will not be fully realised. The Silvertown tunnel is a key part of the plans and is now progressing to the next stage with a consultation that starts on 15 October on detailed propos
  • July 31, 2012
    Dubai metro - the world's longest automated rail system
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.