Skip to main content

Funds for junction improvement to boost safety and tackle congestion

A US$4.6 million Highways Agency project to boost safety and reduce congestion around key junctions along the A585 south of Fleetwood in Lancashire, UK, is underway. The road is to be widened and improved at two junctions, boosting capacity between Bourne Way and West Drive and providing an additional lane in each direction. Signals at the junction with Bourne Way will improve the safety and ease for drivers joining and leaving the A585. Work on the improvements started on Monday 15 September and is due
October 6, 2014 Read time: 1 min
A US$4.6 million Highways Agency project to boost safety and reduce congestion around key junctions along the A585 south of Fleetwood in Lancashire, UK, is underway.

The road is to be widened and improved at two junctions, boosting capacity between Bourne Way and West Drive and providing an additional lane in each direction. Signals at the junction with Bourne Way will improve the safety and ease for drivers joining and leaving the A585. Work on the improvements started on Monday 15 September and is due to be completed before Christmas.

Alan Shepherd, the Highways Agency’s North West regional director said, “Increasing road capacity along the A585 and improving safety and reducing congestion around these busy junctions will help support the creation of new homes and jobs in this part of Lancashire. We are delighted the project is now underway.”

Related Content

  • Balfour Beatty JV to deliver UK smart motorways package
    July 22, 2015
    The Balfour Beatty Vinci joint venture has been awarded a contract by Highways England to deliver a smart motorway package worth up to US$792 million, the largest of Highways England’s three packages within its US$2.3 billion Smart Motorway Programme. The joint venture will deliver smart motorway upgrades to a ten mile stretch of the M5 Junctions 4a to 6 in Worcestershire; a 12 mile section of the M6 Junctions 2 to 4 in the Midlands and a 32 mile stretch of the M4 Junctions 3 to 12 in London and Berkshir
  • Jenoptik supplies sophisticated multi-section control project
    November 17, 2014
    Efficient speed enforcement in the most highly frequented tunnel in Austria on the A7 near Linz. The Bindermichl-Niedernhart tunnel complex on Austrian highway A7 connects the major east/west A1 route from Vienna/ Bratislava to Munich/Salzburg with the A7/ E55 running south from Prague in the Czech Republic. This happens right in the middle of the city of Linz, Austria.
  • Clearview Traffic shortlisted for two Highways Excellence Awards
    September 28, 2012
    Clearview Traffic Group has been shortlisted in two different categories for the Highways Magazine Excellence Awards 2012, with two diverse road delineation projects. In the Road Marking Project of the Year category, the company has been chosen as a finalist for its dynamic delineation project for the Hindhead Tunnel in Surrey, UK, where Clearview installed 868 Astucia IRS2 hardwired bi-directional road studs in a project initiated by the Highways Agency (HA) in 2007 to remove a major source of congestion a
  • European tunnel upgrades following new safety legislation
    August 20, 2015
    Across Europe there is a very mixed picture of compliance to latest safety standards for road tunnels. Best practice has emerged, however, in the wake of European legislation. Jon Masters reports High profile fatal fires following accidents in the Mont Blanc, Tauern and Gotthard tunnels prompted the 2004 European Union Directive 2004/54 on road tunnel safety. This meant all EU member states would have to meet new standards of safety in road tunnels by 30 April 2014. The Directive applied to all tunnels over