Skip to main content

FTA pledges $14m for US transit projects

Robotic Research to equip docking solution for disabled people on Kansas buses
By Ben Spencer September 9, 2020 Read time: 2 mins
Robotic Research systems previously featured on ParaLift vehicles (© Robotic Research)

The US Department of Transportation's Federal Transit Administration (FTA) is providing approximately $14 million to 25 projects developing technologies focused on transport accessibility, vehicle automation and microtransit.

FTA deputy administrator K. Jane Williams, says: "As we face this public health emergency, investments in innovation are critical for transit agencies to better meet rider expectations and adapt to changes in our transportation system.”

The FTA is making the money available through the accelerating innovative mobility (AIM) initiative, which supports companies that test nationwide approaches to help public transportat providers and passengers.

For example, Robotic Research and the Kansas City Area Transportation Authority will use a $600,000 AIM grant to develop a docking precision solution to help bus drivers maintain Americans with Disability Act-compliant gaps at all stops. 

The autonomous technology provider says its advanced driver assistance system (ADAS) will improve accessibility and reduce dwell time. 

Three buses will be equipped with an ADAS system that uses sensors to provide precision guidance to drivers without mechanical retrofits, Robotic Research adds. 

In Kentucky, the Transit Authority of the Lexington Fayette Urban County Government will receive $422,625 to develop a platform that provides real-time vehicle and demand information for transportation options on the University of Kentucky campus.

The platform will allow students to book a ride while dispatchers manage vehicle capacity and support social distancing efforts during the coronavirus pandemic.

In a separate project, the City of Wilson in North Carolina will utilise $250,000 to replace its fixed-route transit service with on-demand, rural microtransit to help solve first- and last-mile connections.

Additionally, the Metropolitan Transit Authority of Harris County will obtain approximately $1.5 million to develop an autonomous electric shuttle bus that will serve Texas Southern University, the University of Houston and Houston’s Third Ward community.

It will connect to metro buses and light rail and be studied for potential use in urban, suburban and rural environments.

Meanwhile, the Oregon Department of Transportation will acquire $480,000 to build a web-based repository of transit data, census data and open-source software. It will build a user interface providing near real-time and historical transit network information to planners to support the investment and management of large transit networks.

FTA received 75 eligible proposals totalling approximately $62.3 million in funding requests from 33 states and territories.

For more information on companies in this article

Related Content

  • Cubic’s holistic view of traffic management
    May 25, 2022
    How can cities and transit agencies ease congested roadways? Andy Taylor of Cubic Transportation Systems suggests it would help to take a more holistic view of the problem
  • Report analyses multiple ITS projects to highlight cost and benefits
    March 16, 2015
    Every year in America cost benefit analysis is carried out on dozens of ITS installations and pilot studies and the findings, along with the lessons learned, are entered into the Department of Transportation’s (USDOT’s) web-based ITS Knowledge Resources database. This database holds more than 1,600 reports and periodically the USDOT reviews the material on file to draw conclusions from this wider body of evidence. It has just published one such review ITS Benefits, Costs, and Lessons Learned: 2014 Update Re
  • Bogota's metro tender delayed
    July 25, 2014
    The tender for Bogota, Colombia’s decades-long and much-delayed first metro line has been pushed to the first quarter of 2015 following expansion of the US$3.6 billion project. The original project included the construction of the first line of Bogota’s 26.5 kilometre long metro, which would have 28 stations and be used by around 600,000 people a day. This is the first of four lines planned to be built in the next 30 years. The metro will complement the existing urban transport system by handling 50 p
  • National funding cuts cause fragmentation of US ITS market
    February 1, 2012
    Paul Everett, Research Director with IMS Research, looks at how ITS deployment varies across the US and what this means in terms of market potential for systems manufacturers and suppliers At the end of 2010, the US will have a total resident population of close to 310 million, rising to an estimated 439 million by 2050.