Skip to main content

FTA demands no more delay in new Thames Crossing

Responding to the yesterday’s announcement that there is still no definitive answer to the location of the new Thames Crossing, the message from the Freight Transport Association (FTA) was “don’t delay and let the building begin to help improve capacity and ease congestion at Dartford as soon as possible”. The Government has stated that Option B connecting the A2 Swanscombe Peninsula with the A1089 has been ruled out of the process, but has failed to confirm as to where the new Lower Thames crossing wil
December 13, 2013 Read time: 3 mins
Responding to the yesterday’s announcement that there is still no definitive answer to the location of the new Thames Crossing, the message from the 6983 Freight Transport Association (FTA) was “don’t delay and let the building begin to help improve capacity and ease congestion at Dartford as soon as possible”.

The Government has stated that Option B connecting the A2 Swanscombe Peninsula with the A1089 has been ruled out of the process, but has failed to confirm as to where the new Lower Thames crossing will be situated and says a final decision will not be made until May 2014.  

FTA contributed to the 1837 Department for Transport consultation on behalf of its members, stating that a new Thames Crossing would be an integral part of the solution to improve capacity for traffic at Dartford. The Association added that there was an urgent and vital need to ease congestion at what is one of the most important national artery routes.

“Congestion needs tackling now,” declared FTA, stating that the cost of queuing should be taken into account, which for a 44 tonne truck averages £1 per minute, outweighing the cost of the Toll and ultimately the price of constructing the right crossing to relieve what are now real pinch-points at Dartford and the Blackwall Tunnel.

Malcolm Bingham, FTA’s head of Road Network Management Policy said: “FTA believes that today’s announcement brings us no closer to building the much needed new Lower Thames Crossing.  There is absolutely no doubt that improving capacity and easing congestion at Dartford is essential.

“After consulting with our members on what the best crossing would be, it was widely considered that Option C would bring the most benefits to the freight industry, and would help tackle congestion at Dartford, and therefore we feel that today’s announcement is simply slowing down the process”.

FTA pointed out that the introduction of free-flow tolling in 2014 will go some way to relieving the queues at the tunnels, but added that even with that, there would still be the requirement for new capacity and there was a definite need to plan more efficiently for the future in order to cope with traffic on these essential routes.

For more information on companies in this article

Related Content

  • Value of time – the key decider
    March 4, 2014
    The ‘value of time’ concept can be a vital decider in prioritising transport projects, as Lorenzo Casullo and Serbjeet Kohli of Steer Davies Gleave explain. How much do travellers value their time and how much would they be willing to pay for a better and faster transport option? For many years Steer Davies Gleave (SDG) has been collecting this type of information from thousands of people across the world as it researches travellers’ behaviour. And given the importance of this parameter for transport mo
  • Connected offers free I2V connectivity
    November 1, 2016
    A new system could reduce the cost of implementing I2V communications across a city to less than that for a single intersection, as Colin Sowman hears. It may seem too good to be true but US company Connected Signals is offering city authorities the equipment to provide infrastructure to vehicle (I2V) communications for free. The system enables drivers to receive information about the timing of signals they are approaching via the EnLighten smartphone app (or connected in-vehicle display).
  • Sweating the asset
    May 22, 2012
    Technological progress has done many things for the good of mankind and, as is evident from this issue of ITS International, it has become fundamental for those needing to ‘sweat the asset’. You will not find that expression anywhere else in this issue, but you will discover a lot pointing to the crucial and expanding role for ITS in getting more out of existing infrastructure.IBM associate partner Michael Noblett puts this into context in our special smart cities feature starting on page 50. Noblett refers
  • Xerox considers smarter city solutions
    October 14, 2016
    Richard Harris from Xerox considers how to alleviate inner-city traffic congestion. Whether travelling for business or leisure, wasting unnecessary time during your journey is a common source of frustration. From dealing with congestion, hold-ups caused by broken down vehicles or crashes to roadworks and other types of delay, wasting time is almost guaranteed to make most people experience additional stress before they even get to where they want to go.