Skip to main content

FTA demands no more delay in new Thames Crossing

Responding to the yesterday’s announcement that there is still no definitive answer to the location of the new Thames Crossing, the message from the Freight Transport Association (FTA) was “don’t delay and let the building begin to help improve capacity and ease congestion at Dartford as soon as possible”. The Government has stated that Option B connecting the A2 Swanscombe Peninsula with the A1089 has been ruled out of the process, but has failed to confirm as to where the new Lower Thames crossing wil
December 13, 2013 Read time: 3 mins
Responding to the yesterday’s announcement that there is still no definitive answer to the location of the new Thames Crossing, the message from the 6983 Freight Transport Association (FTA) was “don’t delay and let the building begin to help improve capacity and ease congestion at Dartford as soon as possible”.

The Government has stated that Option B connecting the A2 Swanscombe Peninsula with the A1089 has been ruled out of the process, but has failed to confirm as to where the new Lower Thames crossing will be situated and says a final decision will not be made until May 2014.  

FTA contributed to the 1837 Department for Transport consultation on behalf of its members, stating that a new Thames Crossing would be an integral part of the solution to improve capacity for traffic at Dartford. The Association added that there was an urgent and vital need to ease congestion at what is one of the most important national artery routes.

“Congestion needs tackling now,” declared FTA, stating that the cost of queuing should be taken into account, which for a 44 tonne truck averages £1 per minute, outweighing the cost of the Toll and ultimately the price of constructing the right crossing to relieve what are now real pinch-points at Dartford and the Blackwall Tunnel.

Malcolm Bingham, FTA’s head of Road Network Management Policy said: “FTA believes that today’s announcement brings us no closer to building the much needed new Lower Thames Crossing.  There is absolutely no doubt that improving capacity and easing congestion at Dartford is essential.

“After consulting with our members on what the best crossing would be, it was widely considered that Option C would bring the most benefits to the freight industry, and would help tackle congestion at Dartford, and therefore we feel that today’s announcement is simply slowing down the process”.

FTA pointed out that the introduction of free-flow tolling in 2014 will go some way to relieving the queues at the tunnels, but added that even with that, there would still be the requirement for new capacity and there was a definite need to plan more efficiently for the future in order to cope with traffic on these essential routes.

For more information on companies in this article

Related Content

  • Need for simpler urban tolling solutions
    January 10, 2013
    A common assumption, even amongst informed observers, is that there’s but a handful of urban charging schemes in operation around the world and scant prospect of that changing any time soon. Larger city-sized schemes such as Singapore, London and Stockholm come readily to mind but if we take a wider view and also consider urban access control and Low Emission Zones (LEZs) then the picture changes rather radically. There is a notable concentration of such schemes in Europe but worldwide the number is comfort
  • IBTTA: States are ‘not waiting for the Federal Government to act’
    November 5, 2014
    The International Bridge, Tunnel and Turnpike Association (IBTTA) has responded to the US mid-term election results when Republicans seized control of the Senate; Patrick D. Jones, executive director and CEO said: “The transportation ballot initiatives in Maryland, Massachusetts, Texas and Wisconsin are strong evidence that states are not waiting for the federal government to act. "Reflecting ongoing concerns over the future of the federal surface transportation reauthorisation, state and local governme
  • ACE report: private sector and user-pay for English roads
    May 16, 2018
    It’s one minute to midnight for funding England’s roads, according to a timely new report - and the clock’s big hand is pointing to some form of user-pay solution, reports David Arminas. Is there any way out of future user-pay funding for England’s highway infrastructure? The answer is a resounding ‘no’, according to the recently-published report Funding Roads for the Future. The 25-page document by the London-based Association for Consultancy and Engineering (ACE) calls for a radical rethink about how to
  • Simplifying enforcement systems type approval
    August 1, 2012
    Martyn Harriss looks at what we can do to simplify the type approval of enforcement equipment in Europe. I doubt that there are many who can remember the days when policemen hid in the bushes with stopwatches and flags to catch speeding motorists - and I'd suggest that back then there were few who were caught who would have dared question the accuracy of those watches or those who operated them. Probably, fewer still here in Europe could have dreamt that a supranational body such as the European Union (EU)